Permanent Homes
Permanent Modular Homes
Explore fixed modular homes for Australian land, from compact secondary dwellings through to larger permanent living options. These homes are reviewed around intended use, site suitability, access, approval pathway and total project scope.
Who this suits
- Primary residences, downsizers and long-term family accommodation.
- Secondary dwelling or guest accommodation pathways where the site supports it.
- Regional and lifestyle properties where controlled factory construction can reduce on-site complexity.
Key benefits
- A more permanent residential pathway than temporary or utility structures.
- Clearer early comparison of size, price range, inclusions and installation considerations.
- Useful for buyers who want a considered home outcome before committing to design or supplier conversations.
Site note
Permanent modular home projects are site-specific. Council, certification, Class 1a, services, access and finance requirements should be confirmed with the relevant authority or qualified professional before committing.
Browse products
Permanent Modular Homes range
5 models
The Haven
From$99,500
Product price only. Site, installation and approval costs quoted separately.
Two-bedroom secondary dwelling
A self-contained second home for family, guests or quiet work — composed at the scale of a single, generous gesture.
The Meridian
From$99,500
Product price only. Site, installation and approval costs quoted separately.
Two-bedroom permanent modular home
A complete two-bedroom home at a considered scale — designed for everyday living, a second residence or a long-term investment.
Configuration
2 bedrooms
Area
Approx. 60 m²
Pathway
Permanent, site-specific
Best use
Permanent home
Compact Living 30 - Manly
From$145,000
Includes standard installation and site costs. Government and approval fees may vary.
30 m2 compact modular home
A compact 30 m2 modular home for efficient living, guest accommodation, home office use or a private retreat.
Area
30 m2
Layout
1 bed / 1 bath / 1 living
Dimensions
5.1 m x 6.6 m
Best use
Compact secondary dwelling
Family Comfort 45 - Bronte
From$168,000
Includes standard installation and site costs. Government and approval fees may vary.
Most popular 45 m2 modular home
A popular 45 m2 modular home with a linear layout, full kitchen, bathroom and alfresco-ready entertaining concept.
Area
45 m2
Layout
1 bed / 1 bath / 1 living
Dimensions
10.5 m x 3.7 m
Best use
Secondary dwelling
Premium Space 60 - Hamilton
From$198,000
Includes standard installation and site costs. Government and approval fees may vary.
60 m2 two-bedroom modular home
A spacious 60 m2 modular home with two bedrooms, full kitchen, full bathroom and alfresco-ready layout.
Area
60 m2
Layout
2 bed / 1 bath / 1 living
Dimensions
12.1 m x 6.1 m
Best use
Two-bedroom secondary dwelling
Planning next steps
Compare the range against your site before you go too far.
A Planning Assessment helps clarify intended use, site access, services, budget and approval considerations before the product conversation becomes too narrow.
Start AssessmentAre permanent modular homes approval-free?
No. Approval requirements vary by state, council, zoning, overlays, services and intended use. Treat every site as requiring its own pathway review.
Does the starting price include every project cost?
No. Visible prices are indicative starting guidance. Final pricing depends on the selected product, site, delivery, approvals, service connections, upgrades and final scope.




