The Haven set lightly into its landscape at golden hour

Collection 01 · Flagship

The Haven

A complete second home, composed at the scale of a single, generous gesture.

From$99,500AUD

Indicative starting price. Final pricing depends on site, delivery, inclusions and approvals.

Enquire Now
View Floor Plan

Area

60 m²

Dimensions

11.2 × 5.4 m

Bedrooms

2

Bathrooms

1

Living areas

1

Overview

Our most considered home, distilled to its essentials.

The Haven is the fullest expression of what modular living can be — a self-contained two-bedroom home designed to feel far larger than its footprint. It is the home we return to when we want to show what is truly possible.

Every element has been resolved until it feels inevitable: fewer rooms, fewer decisions, each one made with intention. What remains is a calm, complete home, ready to live in from the very first evening.

Design Philosophy

Designed around the rhythm of a day.

We begin not with a floorplan but with the day itself — where the first light lands, where you'll pause with a coffee, how the afternoon settles into evening. The Haven is shaped around that rhythm, so the architecture quietly serves the way you actually live.

Read from the garden, it resolves into one warm, grounded volume — honest materials, low and unhurried, nothing performing for attention. Here, restraint is the luxury.

Warm timber, stone and natural light inside The Haven

Considered by design

Resolved by architects who care how a home feels, not only how it looks.

Partner pathway

Progressed through a suitable supplier or factory partner pathway once site, inclusions and project requirements are reviewed.

Made to last

Honest materials chosen to weather gracefully and outlast passing trends.

Interior Experience

Inside, everything softens.

Two bedrooms bracket a shared living heart, finished in warm, tactile materials and bathed in northern light. Generous ceilings lift the volume, while a wide wall of glass dissolves the threshold to the deck. By evening, the living space and the landscape read as one continuous room.

The open living and kitchen heart of The Haven
A calm, light-filled interior with timber detailing
A restful bedroom opening to greenery
The Haven's living space opening onto a deck and the landscape

Indoor & Out

A home that opens to the land.

The Haven is drawn outward. Living space flows onto a covered deck, the garden becomes the largest room in the house, and the boundary between inside and weather is kept as soft as possible — so the home belongs to its setting rather than sitting upon it.

Lifestyle

One home, many lives.

The Haven adapts to the life around it — a second home that becomes whatever your property needs it to be.

A family home, close by

Independent living for parents or grown children, a comfortable few steps from the main house.

A weekend retreat

A calm escape for rest and reset, wherever your land happens to be.

A guest house

A gracious, private space for visitors who'd rather not leave.

A quiet income

A beautifully finished short-stay or rental that more than earns its place.

A room to work

A studio or office a world away from the house, yet only steps from the door.

A first home

A complete, considered home to begin with — nothing oversized, nothing missing.

Gallery

The Haven, in full.

The Haven in its landscape
An interior moment in soft light
A considered detail of The Haven
The Haven sitting lightly on its site
A quiet corner of the home
Living framed by its surroundings

The Plan

Sixty considered square metres.

A single, grounded volume beneath a gentle skillion roofline — every space earning its place.

Floor area — 60 m²Footprint — 11.2 m × 5.4 m

Principal bedroom

With private ensuite access

Second bedroom

Generous, quiet and apart

Open living & dining

The central heart of the home

Kitchen

With an integrated European laundry

Bathroom

Shared, and beautifully finished

Entry & glazing

Sliding glass doors, ready for a front deck

Key Information

The essentials, at a glance.

Configuration

2 bedrooms · 1 bathroom

Floor area

60 m² (11.2 × 5.4 m)

Collection

Permanent Homes

Delivery

Arrives in a container, assembled on site

Positioned for a permanent-home pathway, with engineering, approvals, site suitability and supplier details confirmed during project review.

The Haven, ready for its film

Enquiries

Imagine The Haven on your land.

Tell us about your site and the life you picture there. We'll explore whether The Haven is the right beginning — no pressure, just a considered conversation.

Enquire NowContact ModuHaus

Standard Inclusions

Considered, and included.

Kitchen PackageBathroom PackageDouble-Glazed WindowsSliding Glass DoorsLED DownlightsPower PointsComposite Stone Benchtops

Consultation

Start Your ModuHaus Consultation

Tell us about your vision and our team will help you find the most suitable modular living solution.

We’ll use your details to review your enquiry and contact you about your ModuHaus project. Your project details are not displayed publicly.

Step 1 of 617%

What best describes you?

Enquire