Family Comfort 45 - Bronte modular home exterior with alfresco living connection

Collection 04

Family Comfort 45 - Bronte

Most popular 45 m2 modular home

From$168,000AUD

Indicative starting price. Final pricing depends on site, delivery, inclusions and approvals.

Enquire Now
View Specifications

Area

45 m2

Dimensions

10.5 x 3.7 m

Bedrooms

1

Bathrooms

1

Outdoor

Alfresco concept

A balanced middle option for compact living.

Family Comfort 45 - Bronte is designed for buyers who want more breathing room than a compact studio while keeping the footprint efficient and site-friendly.

With a 45 m2 layout, full kitchen, bathroom, living area and alfresco concept, Bronte is suited to guest accommodation, secondary dwellings, rental accommodation, downsizing and lifestyle properties, subject to site suitability and approvals.

Design Philosophy

Linear, practical and easy to place.

The 10.5 m x 3.7 m form gives Bronte a clear, efficient layout that can be easier to understand early in planning.

The alfresco concept adds lifestyle value by extending daily living outdoors, while final delivery and installation scope should be confirmed before purchase.

Family Comfort 45 - Bronte lifestyle view showing a calm outdoor setting

Lifestyle

Compact living with more breathing room.

Bronte is a strong all-rounder for customers comparing compact homes for longer stays, guest accommodation or secondary dwelling use.

A popular all-rounder

A 45 m2 footprint gives more comfort than a studio without moving into a larger home scale.

Alfresco-ready living

Outdoor connection can support entertaining, short-stay appeal and everyday lifestyle value.

Guest or downsizer fit

The one-bedroom plan can suit premium guest stays, downsizing or compact long-stay living.

Flexible collection

The collection supports 1-2 bedroom and 1-2 bathroom options, subject to final model availability.

Key Features

Considered, down to the detail.

45 m2 linear layout

A longer, efficient plan for practical placement and clear room organisation.

Most Popular option

Positioned as the balanced middle model in the Premium Modular Living range.

Full kitchen and bathroom

Standard inclusions may include a full kitchen with appliances and a bathroom package.

Alfresco concept

Designed to support a stronger connection between indoor living and outdoor entertaining.

Eight design options

The collection notes eight available designs, subject to confirmation during enquiry.

Collection flexibility

Supports 1-2 bedroom and 1-2 bathroom options where available and compatible.

Interior

Practical comfort for longer stays.

Inside, Bronte is planned around a full kitchen, bathroom, living area and one-bedroom accommodation. Final fixtures, appliance selections and layout details are confirmed through quotation and contract.

Family Comfort 45 - Bronte open-plan living and kitchen interior
Family Comfort 45 - Bronte kitchen and interior finishes
Family Comfort 45 - Bronte bathroom or compact interior detail

Floor Plan

Every metre, considered.

Family Comfort 45 - Bronte floor plan

The ModuHaus Difference

Why ModuHaus

ModuHaus helps customers compare practical modular home options against the realities of their site, use and pathway.

01

Balanced guidance

Bronte helps frame the middle choice between compact studio and larger two-bedroom living.

02

Site-aware planning

We review delivery access, services and council context before a project pathway is assumed.

03

Clear inclusions

Standard inclusions and upgrades are discussed carefully so final pricing is easier to understand.

04

Supplier pathway

The right supplier or factory partner pathway is confirmed after site and scope review.

Key Information

The essentials, at a glance.

Area

45 m2

Layout

1 bed / 1 bath / 1 living

Dimensions

10.5 m x 3.7 m

Best use

Popular all-rounder

Ideal forSecondary dwellingPremium guest accommodationDownsizer modular homeShort-stay rental accommodationRural or coastal lifestyle propertyFamily accommodationCompact long-stay livingStudio-style retreat with stronger amenities

Specifications

The details that shape the model.

Source-backed information for early planning. Final inclusions, dimensions and documentation should be confirmed during enquiry.

Model code

EG-45-01

Collection

Premium Modular Living

Category

Permanent Home / Premium Modular Home / Family Comfort

Area

45 m2

Dimensions

10.5 m x 3.7 m

Layout

1 bedroom / 1 bathroom / 1 living area

Designs in collection

8 designs available

Collection flexibility

Supports 1-2 bedroom and 1-2 bathroom options

Indicative price

From $168K + GST; site costs may vary

Standard inclusions

Full kitchen with appliances, bathroom package, two 2.6 kW air-conditioning units, glazing, LED downlights and power points may be included, subject to final contract confirmation

Optional Upgrades

Configure the details that matter.

Facade Upgrade - from $8K, subject to final availability, design compatibility and quotationGreen Energy - from $5K, including solar, battery, EV charging or smart meter options where suitableLandscaping - from $6K, including garden design, decking, fencing or outdoor lighting where suitableKitchen & Bath - from $4K, including benchtop, tapware and shower upgrades where compatibleAppliances - from $3K, including selected kitchen, laundry or air-conditioning upgradesFurniture Package - from $5K, subject to final styling scope and availabilityNeural Hub - from $3K, smart home automation naming to be confirmed by ModuHaus before publishing

Planning Notes

What to confirm before the site is ready.

Delivery & Installation

Delivery, on-site installation and any alfresco or external works should be confirmed during quotation. Site costs may vary.

Utilities

Service availability, connection distance, wastewater requirements and licensed trade scope must be reviewed for the site.

Warranty & Support

The source material notes a 10-year structural warranty as a possible base-price inclusion. Final warranty terms must be confirmed in the contract.

Council & Compliance

Council and approval requirements vary by location, zoning and intended use. DA lodgement may be part of base pricing where eligible, subject to final contract confirmation.

Standard Inclusions

Considered, and included.

One-Bedroom LayoutFull Kitchen With AppliancesBathroom Package2 x 2.6 kW Air ConditioningAlfresco-Ready ConceptLED DownlightsPower Points

Product FAQs

Common questions, answered simply.

Are site costs included?

Site costs may vary. Final pricing depends on location, site access, ground conditions, service connections, council requirements, selected upgrades and any additional works required.

Are these homes suitable as secondary dwellings?

They may suit secondary dwelling use depending on the property, council area, zoning, overlays and intended use. ModuHaus should review site requirements before suitability is confirmed.

Is council approval required?

Approval requirements vary by council, zoning and intended use. The source material notes DA lodgement as a possible base-price inclusion, but the approval pathway should be confirmed for each site.

What is included in the base price?

Base pricing may include design and engineering, council DA lodgement, factory construction, delivery to site, on-site installation, standard inclusions, quality inspections and a 10-year structural warranty, subject to final contract confirmation.

Can I upgrade finishes or energy systems?

Optional upgrades may include facade, green energy, landscaping, kitchen and bathroom, appliances, furniture and smart home automation packages, subject to availability, design compatibility and quotation.

What Affects Final Pricing

A guide price, then a plan that fits your site.

The figure shown is an indicative starting point. Your final investment is shaped during consultation — these are the details that move it.

Location, delivery distance and access for trucks, crane or lifting equipment.

Ground conditions, site preparation, foundations and service connection requirements.

Council, zoning, overlays, documentation and approval pathway requirements.

Selected upgrades, finish level, appliances, furniture, landscaping and outdoor works.

Any additional site-specific works required before delivery or installation can proceed.

Final inclusions, delivery and installation scope confirmed in the contract.

What Happens Next

From first conversation to keys.

01

Share your site

Tell us where the home may be placed, how it will be used and the timing you have in mind.

02

Review suitability

We review size, access, services, approvals and the supplier pathway before recommending next steps.

03

Shape the specification

Inclusions, upgrades, delivery scope and site-specific requirements are clarified before final pricing.

04

Confirm the pathway

Once scope is understood, the project can move toward proposal, contract confirmation and delivery planning.

Site Suitability Matters

The right modular solution still needs the right site conditions.

A modular solution is only suitable if the site can support delivery, access, installation and the intended use. Before final pricing or delivery, key site details may need to be reviewed.

delivery access width and driveway slope

crane or truck access and installation space

ground conditions and site preparation

services, utilities and connection requirements

local council controls and intended use

bushfire, flood, wind or coastal exposure where relevant

Site suitability guidance is preliminary and does not replace advice from builders, engineers, certifiers, planners, installers or council.

Approvals, Delivery & Installation

Council requirements, permits, engineering, delivery and installation conditions can vary by property, council area, intended use and product type. Information on this website is general in nature and should not be treated as building, legal, planning, engineering or financial advice. Confirm requirements with the relevant council, certifier, builder, installer, engineer or other qualified professional before making a purchase or project decision.

Consultation

Start Your ModuHaus Consultation

Tell us about your vision and our team will help you find the most suitable modular living solution.

We’ll use your details to review your enquiry and contact you about your ModuHaus project. Your project details are not displayed publicly.

Step 1 of 617%

What best describes you?

Enquiries

Compare Bronte for your property.

Share your site, intended use and timing. We'll help review whether Bronte is the right middle option for your modular home pathway.

Next Collection

Premium Space 60 - Hamilton

Enquire