Compact Living 30 - Manly compact modular home exterior in a landscaped setting

Collection 03

Compact Living 30 - Manly

30 m2 compact modular home

From$145,000AUD

Indicative starting price. Final pricing depends on site, delivery, inclusions and approvals.

Enquire Now
View Specifications

Area

30 m2

Dimensions

5.1 x 6.6 m

Bedrooms

1

Bathrooms

1

Living areas

1

Compact living, resolved with care.

Compact Living 30 - Manly is designed for customers who need a smaller modular home without losing comfort, presentation or everyday functionality.

With a 30 m2 footprint, one bedroom, one bathroom and one living area, Manly can support compact living, a backyard guest suite, private studio, short-stay accommodation concept or lifestyle-property retreat, subject to site-specific requirements.

Design Philosophy

A smaller footprint with a clear purpose.

The Manly model uses a compact 5.1 m x 6.6 m footprint to create a self-contained space that feels calm, practical and easy to understand.

Optional deck and garage storage upgrades can improve outdoor usability and long-term storage, while final inclusions are confirmed through the project pathway.

Compact Living 30 - Manly modular home lifestyle view with warm materials

Lifestyle

A private room for living, working or hosting.

Manly is a compact studio-style home for sites that need a complete but restrained modular footprint.

Compact secondary dwelling

A smaller self-contained option for guest stays, family support or downsizer accommodation, subject to local requirements.

Studio or office flexibility

The compact plan can support focused work, creative use or private retreat needs when residential use is not the only goal.

Short-stay potential

A simple one-bedroom arrangement can suit lifestyle-property or weekender concepts where the site and approvals align.

Optional outdoor connection

Deck and storage options can be considered where they suit the design, site and final quotation.

Key Features

Considered, down to the detail.

30 m2 compact footprint

A smaller modular format designed for efficient living and easier site fit.

One-bedroom layout

A practical bedroom, bathroom and living arrangement for guest, studio or compact residential use.

Kitchen and bathroom package

Standard inclusions may include a kitchen package, bathroom package, lighting, power points and air conditioning.

Seven design options

The collection notes seven available designs, with final model availability confirmed during enquiry.

Optional deck and storage

Outdoor and storage upgrades can be reviewed where they suit the site and design compatibility.

Site-specific pathway

Approval, delivery and installation requirements vary by council, zoning, access and intended use.

Interior

Everything needed, kept close.

The interior is planned around a compact living rhythm: a bedroom, bathroom and living area supported by practical kitchen and comfort inclusions. Final finish level and layout details are confirmed before contract.

Compact Living 30 - Manly interior living area with natural light
Compact Living 30 - Manly kitchen and compact interior detail
Compact Living 30 - Manly bedroom or private retreat interior

Floor Plan

Every metre, considered.

Compact Living 30 - Manly floor plan

The ModuHaus Difference

Why ModuHaus

ModuHaus helps compare the home, site and supplier pathway before assumptions become expensive.

01

Clear comparison

Manly gives customers a compact benchmark for comparing size, use and budget.

02

Guided site review

Site access, approvals and services are reviewed before a final pathway is recommended.

03

Considered upgrades

Optional deck, storage and finish upgrades are discussed against site fit and final quotation.

04

Supplier pathway

Final delivery, installation and inclusions are confirmed through the suitable supplier or factory partner pathway.

Key Information

The essentials, at a glance.

Area

30 m2

Layout

1 bed / 1 bath / 1 living

Dimensions

5.1 m x 6.6 m

Best use

Guest suite / studio

Ideal forCompact secondary dwellingBackyard guest suiteHome office or private studioShort-stay accommodationLifestyle property retreatWeekender cabinDownsizer accommodationFamily support accommodation

Specifications

The details that shape the model.

Source-backed information for early planning. Final inclusions, dimensions and documentation should be confirmed during enquiry.

Model code

EG-30-01

Collection

Premium Modular Living

Category

Permanent Home / Premium Modular Home / Compact Living

Area

30 m2

Dimensions

5.1 m x 6.6 m

Layout

1 bedroom / 1 bathroom / 1 living area

Designs in collection

7 designs available

Indicative price

From $145K + GST; site costs may vary

Standard inclusions

Kitchen package, bathroom package, 2.6 kW air conditioning, glazing, LED downlights and power points may be included, subject to final contract confirmation

Optional Upgrades

Configure the details that matter.

Facade Upgrade - from $8K, subject to final availability, design compatibility and quotationGreen Energy - from $5K, including solar, battery, EV charging or smart meter options where suitableLandscaping - from $6K, including garden design, decking, fencing or outdoor lighting where suitableKitchen & Bath - from $4K, including benchtop, tapware and shower upgrades where compatibleAppliances - from $3K, including selected kitchen, laundry or air-conditioning upgradesFurniture Package - from $5K, subject to final styling scope and availabilityNeural Hub - from $3K, smart home automation naming to be confirmed by ModuHaus before publishing

Planning Notes

What to confirm before the site is ready.

Delivery & Installation

Delivery and installation scope should be confirmed before purchase. Site access, lifting requirements, foundations and service connections may affect final project cost.

Utilities

Power, water, wastewater and other service connections must be reviewed for the specific site and completed by appropriately licensed trades where required.

Warranty & Support

The source material notes a 10-year structural warranty as a possible base-price inclusion. Final warranty terms must be confirmed in the contract.

Council & Compliance

Approval requirements vary by council, zoning and intended use. Do not assume approval is guaranteed or that no approval is required.

Standard Inclusions

Considered, and included.

One-Bedroom LayoutKitchen PackageBathroom Package2.6 kW Air ConditioningGlass Sliding DoorLED DownlightsPower Points

Product FAQs

Common questions, answered simply.

Are site costs included?

Site costs may vary. Final pricing depends on location, site access, ground conditions, service connections, council requirements, selected upgrades and any additional works required.

Are these homes suitable as secondary dwellings?

They may suit secondary dwelling use depending on the property, council area, zoning, overlays and intended use. ModuHaus should review site requirements before suitability is confirmed.

Is council approval required?

Approval requirements vary by council, zoning and intended use. The source material notes DA lodgement as a possible base-price inclusion, but the approval pathway should be confirmed for each site.

What is included in the base price?

Base pricing may include design and engineering, council DA lodgement, factory construction, delivery to site, on-site installation, standard inclusions, quality inspections and a 10-year structural warranty, subject to final contract confirmation.

Can I upgrade finishes or energy systems?

Optional upgrades may include facade, green energy, landscaping, kitchen and bathroom, appliances, furniture and smart home automation packages, subject to availability, design compatibility and quotation.

What Affects Final Pricing

A guide price, then a plan that fits your site.

The figure shown is an indicative starting point. Your final investment is shaped during consultation — these are the details that move it.

Location, delivery distance and access for trucks, crane or lifting equipment.

Ground conditions, site preparation, foundations and service connection requirements.

Council, zoning, overlays, documentation and approval pathway requirements.

Selected upgrades, finish level, appliances, furniture, landscaping and outdoor works.

Any additional site-specific works required before delivery or installation can proceed.

Final inclusions, delivery and installation scope confirmed in the contract.

What Happens Next

From first conversation to keys.

01

Share your site

Tell us where the home may be placed, how it will be used and the timing you have in mind.

02

Review suitability

We review size, access, services, approvals and the supplier pathway before recommending next steps.

03

Shape the specification

Inclusions, upgrades, delivery scope and site-specific requirements are clarified before final pricing.

04

Confirm the pathway

Once scope is understood, the project can move toward proposal, contract confirmation and delivery planning.

Site Suitability Matters

The right modular solution still needs the right site conditions.

A modular solution is only suitable if the site can support delivery, access, installation and the intended use. Before final pricing or delivery, key site details may need to be reviewed.

delivery access width and driveway slope

crane or truck access and installation space

ground conditions and site preparation

services, utilities and connection requirements

local council controls and intended use

bushfire, flood, wind or coastal exposure where relevant

Site suitability guidance is preliminary and does not replace advice from builders, engineers, certifiers, planners, installers or council.

Approvals, Delivery & Installation

Council requirements, permits, engineering, delivery and installation conditions can vary by property, council area, intended use and product type. Information on this website is general in nature and should not be treated as building, legal, planning, engineering or financial advice. Confirm requirements with the relevant council, certifier, builder, installer, engineer or other qualified professional before making a purchase or project decision.

Consultation

Start Your ModuHaus Consultation

Tell us about your vision and our team will help you find the most suitable modular living solution.

We’ll use your details to review your enquiry and contact you about your ModuHaus project. Your project details are not displayed publicly.

Step 1 of 617%

What best describes you?

Enquiries

Could Manly fit your site?

Tell us how you plan to use the space and where it may be placed. We'll help review whether Manly is the right compact modular home to explore.

Next Collection

Family Comfort 45 - Bronte

Enquire