The 4m Backyard Office Pod set on a manicured lawn at golden hour, its rounded white form framed by trees

Collection 04

4m Backyard Office Pod

Office pod with bed, bath & cabinetry

From$16,854AUD

Indicative starting price. Final pricing depends on site, delivery, inclusions and approvals.

Enquire Now

Area

~8 m²

Dimensions

3.9 × 2.2 m

Bedroom

1

Bathroom

1

The room your home has been missing.

the 4m Backyard Office Pod is a small, self-contained room designed for the garden — a place to work, create or simply step away. It arrives complete and settles quietly at the end of the lawn, a considered space that feels a world apart while staying close to home.

Small in footprint, generous in calm: it is proof that a modest room, beautifully resolved, can change how a whole property feels.

Design Philosophy

Small footprint, considered to the last detail.

A compact space leaves nowhere to hide, so every decision matters more. the 4m Backyard Office Pod is pared back to what earns its place — good light, honest materials, and a quiet that makes focus effortless.

It reads as architecture, not a shed: a precise little volume that belongs in the garden as naturally as a tree.

The precise, architectural form of the 4m Backyard Office Pod settled into a garden

Lifestyle

A few steps away, a world apart.

A dedicated room beyond the back door changes the rhythm of a day — a place to focus, create or retreat without leaving home.

Work, without the commute

A calm, separate office that ends the day when you close the door.

Room to create

A studio for making, music or quiet thought, away from the busy house.

A quiet retreat

A guest room, reading room or escape — whatever the garden needs it to be.

Arrives complete

Delivered finished and set down lightly, ready to use almost at once.

Key Features

Considered, down to the detail.

A complete ensuite, built in

A private shower and toilet with full plumbing make this a true guest space — not just a room with a desk.

A bed that appears when needed

A pull-out bed frame turns the studio into comfortable overnight accommodation in moments, then disappears by morning.

Storage, thoughtfully placed

Wall cabinets keep belongings tidy and the floor open, so a compact footprint never feels tight.

Comfortable in any climate

Insulated panels and double-glazed windows hold a calm, even temperature right through the seasons.

Ready to connect

Plumbing and electrical arrive pre-installed, so site setup is quick once licensed trades make the final connection.

Arrives complete

Delivered finished and placed gently — typically within a day of arriving on your land.

Interior

Calm, bright, and ready to use.

Inside, the 4m Backyard Office Pod is a single considered room — well lit, well proportioned, and finished with the same care as a whole home. It feels settled and warm the moment you step in.

Inside the pod — a built-in desk, integrated cabinetry and an office chair beside full-height glazing
The pod's clean front elevation, glazed doors opening to the garden
The rounded-corner rear form of the pod amongst established planting

Floor Plan

Every metre, considered.

Floor plan of the 4m Backyard Office Pod showing the living space, bathroom and integrated storage

Indicative layout — final dimensions confirmed in supplier plans

The ModuHaus Difference

Why ModuHaus

Even our smallest room is designed, made and delivered with the same considered care — so it feels every bit a ModuHaus.

01

Architect-considered design

A small room resolved with the same rigour as a whole home.

02

Partner-built pathway

Supplied through a suitable partner pathway, with final inclusions and delivery details confirmed during review.

03

Placed gently on your land

Set down lightly in the garden, with minimal disruption.

04

Guided, end to end

One team beside you, from first idea to the day you begin.

Key Information

The essentials, at a glance.

Configuration

Bedroom · bathroom · study

Footprint

3.9 × 2.2 m

Collection

Pods

Delivery

Arrives fully assembled

Ideal forBackyard officeGuest accommodationAirbnb / short-stayCreative studioHome businessPrivate retreat

Standard Inclusions

Considered, and included.

KitchenetteBathroom PackageDouble-Glazed WindowsLED DownlightsPower PointsPre-Plumbed & Wired

Download Brochure

The full 4m Backyard Office Pod, on paper.

Download the complete product brochure for detailed information, floorplans and specifications — yours to keep and share.

Download Brochure

Transparent Pricing

From pricing gives a starting point, not the final project cost.

Prices shown on ModuHaus are indicative starting prices unless clearly stated otherwise. Final pricing can vary depending on product specification, site conditions, delivery location, installation scope, service connections and approval pathway.

model, size, layout and inclusions

finish level, upgrades and custom requirements

delivery distance, transport and crane requirements

site access, preparation and installation scope

service connections, engineering and certification

council or approval pathway requirements

What Happens After Enquiry

A considered review before quote or delivery discussions.

After you submit an enquiry, the ModuHaus team reviews your project details before recommending the most suitable next step. We do not treat enquiry forms as instant final quotes.

01

We receive your enquiry

Your message or Project Plan is saved for review by the ModuHaus team.

02

We review fit and context

We look at location, intended use, budget range, timing and any product recommendation.

03

We may request site details

Photos, access information, service requirements or council context may be needed before the next step.

04

You receive next-step guidance

The response may point toward a product, supplier pathway, consultation or further suitability review.

Site Suitability Matters

The right modular solution still needs the right site conditions.

A modular solution is only suitable if the site can support delivery, access, installation and the intended use. Before final pricing or delivery, key site details may need to be reviewed.

delivery access width and driveway slope

crane or truck access and installation space

ground conditions and site preparation

services, utilities and connection requirements

local council controls and intended use

bushfire, flood, wind or coastal exposure where relevant

Site suitability guidance is preliminary and does not replace advice from builders, engineers, certifiers, planners, installers or council.

Approvals, Delivery & Installation

Council requirements, permits, engineering, delivery and installation conditions can vary by property, council area, intended use and product type. Information on this website is general in nature and should not be treated as building, legal, planning, engineering or financial advice. Confirm requirements with the relevant council, certifier, builder, installer, engineer or other qualified professional before making a purchase or project decision.

Consultation

Start Your ModuHaus Consultation

Tell us about your vision and our team will help you find the most suitable modular living solution.

We’ll use your details to review your enquiry and contact you about your ModuHaus project. Your project details are not displayed publicly.

Step 1 of 617%

What best describes you?

Enquiries

Picture the 4m Backyard Office Pod in your garden.

Tell us how you'd use a room of your own at the end of the garden. We'll explore whether the 4m Backyard Office Pod is the right beginning.

Next Collection

3m Backyard Office Pod

Enquire