The 3m Backyard Office Pod open to a garden at golden hour, its desk and chair framed by the doorway

Collection 05

3m Backyard Office Pod

Compact backyard office

From$12,040AUD

Indicative starting price. Final pricing depends on site, delivery, inclusions and approvals.

Enquire Now

Area

~6 m²

Dimensions

2.9 × 2.2 m

Office

1

Storage

Built-in

Small footprint, considered to the last detail.

The 3m Backyard Office Pod is the most distilled space in the collection — a single, calm room designed to drop into the garden and change how a day feels. With integrated cabinetry and good light, it asks for very little and gives back a great deal.

A focused office, a reading room, a place to make and think: it is proof that the smallest room, beautifully made, can be the most useful one you own.

Design Philosophy

A room with one purpose.

There is a particular calm to a space made for a single thing. The Office Pod is pared back to what matters — honest materials, soft natural light, and built-in joinery that keeps everything in its place.

It reads as architecture, not a shed: a precise little volume that belongs in the garden as naturally as a tree.

The precise, architectural form of the 3m Backyard Office Pod set into a garden

Lifestyle

A few steps away, a world apart.

A dedicated room beyond the back door changes the rhythm of a day — somewhere to focus, host or simply slow down, without ever leaving home.

Work, without the commute

A calm, separate office that begins and ends the day the moment you open or close the door.

A guest room when you need it

Add a daybed and the same room becomes a quiet, private place for visitors to land.

Yours to reconfigure

Office today, studio or reading retreat tomorrow — an open room that flexes with the seasons of life.

Comfortable all year

Insulated panels and double-glazed glass keep it calm through summer heat and winter mornings alike.

Key Features

Considered, down to the detail.

Quiet, light-filled glazing

Double-glazed tempered glass and a wide doorway fill the room with daylight while keeping it calm and comfortable.

Fresh air & soft light

A side push-out window and an overhead spotlight bring in a breeze and a gentle glow whenever you need it.

Joinery that earns its place

An integrated desk and cabinetry keep everything in reach and the floor clear — storage without the clutter.

Ready to plug in

Pre-wired and electrical-ready, so a licensed connection is the only step between delivery and your first day.

Built for the outdoors

An insulated steel frame and sealed panels are made to weather Australian conditions, season after season.

Arrives complete

Delivered finished and set down gently — typically in a day, with minimal disruption to your garden.

Interior

Calm, bright, and ready to use.

Inside, the 3m Backyard Office Pod is a single considered room — well lit, well proportioned, and finished with the same care as a whole home. A sculpted desk and integrated joinery do the quiet work, leaving the floor open and the mind clear.

Inside the pod — a wrap-around desk, integrated cabinetry and a soft office chair under warm lighting
A corner desk beneath a push-out window, finished in warm white joinery
The pod open to the garden, its interior glowing in the late afternoon light

Floor Plan

Every metre, considered.

Floor plan of the 3m Backyard Office Pod showing the wrap-around desk, drawers and tall storage

Indicative layout — final dimensions confirmed in supplier plans

The ModuHaus Difference

Why ModuHaus

Even our smallest room is designed, made and delivered with the same considered care.

01

Architect-considered design

A small room resolved with the same rigour as a whole home.

02

Partner-built pathway

Supplied through a suitable partner pathway, with final inclusions and delivery details confirmed during review.

03

Placed gently on your land

Set down lightly in the garden, with minimal disruption.

04

Guided, end to end

One team beside you, from first idea to the day you begin.

Key Information

The essentials, at a glance.

Configuration

Open studio · integrated joinery

Footprint

2.9 × 2.2 m

Collection

Pods

Delivery

Arrives fully assembled

Ideal forBackyard officeCreative studioGuest accommodationTeen retreatReading & quiet spaceFlexible living space

Standard Inclusions

Considered, and included.

Built-in Desk & CabinetryDouble-Glazed WindowsLED DownlightsPower Points

Download Brochure

The full 3m Backyard Office Pod, on paper.

Download the complete product brochure for detailed information, floorplans and specifications — yours to keep and share.

Download Brochure

Transparent Pricing

From pricing gives a starting point, not the final project cost.

Prices shown on ModuHaus are indicative starting prices unless clearly stated otherwise. Final pricing can vary depending on product specification, site conditions, delivery location, installation scope, service connections and approval pathway.

model, size, layout and inclusions

finish level, upgrades and custom requirements

delivery distance, transport and crane requirements

site access, preparation and installation scope

service connections, engineering and certification

council or approval pathway requirements

What Happens After Enquiry

A considered review before quote or delivery discussions.

After you submit an enquiry, the ModuHaus team reviews your project details before recommending the most suitable next step. We do not treat enquiry forms as instant final quotes.

01

We receive your enquiry

Your message or Project Plan is saved for review by the ModuHaus team.

02

We review fit and context

We look at location, intended use, budget range, timing and any product recommendation.

03

We may request site details

Photos, access information, service requirements or council context may be needed before the next step.

04

You receive next-step guidance

The response may point toward a product, supplier pathway, consultation or further suitability review.

Site Suitability Matters

The right modular solution still needs the right site conditions.

A modular solution is only suitable if the site can support delivery, access, installation and the intended use. Before final pricing or delivery, key site details may need to be reviewed.

delivery access width and driveway slope

crane or truck access and installation space

ground conditions and site preparation

services, utilities and connection requirements

local council controls and intended use

bushfire, flood, wind or coastal exposure where relevant

Site suitability guidance is preliminary and does not replace advice from builders, engineers, certifiers, planners, installers or council.

Approvals, Delivery & Installation

Council requirements, permits, engineering, delivery and installation conditions can vary by property, council area, intended use and product type. Information on this website is general in nature and should not be treated as building, legal, planning, engineering or financial advice. Confirm requirements with the relevant council, certifier, builder, installer, engineer or other qualified professional before making a purchase or project decision.

Consultation

Start Your ModuHaus Consultation

Tell us about your vision and our team will help you find the most suitable modular living solution.

We’ll use your details to review your enquiry and contact you about your ModuHaus project. Your project details are not displayed publicly.

Step 1 of 617%

What best describes you?

Enquiries

Picture the Office Pod in your garden.

Tell us how you'd use a focused room of your own. We'll explore whether the 3m Backyard Office Pod is the right beginning.

Next Collection

6m Backyard Office Pod

Enquire