The Clearing exterior by ModuHaus

Collection 29

The Clearing

Two-bedroom expandable home

From$34,500AUD

Indicative starting price. Final pricing depends on site, delivery, inclusions and approvals.

Enquire Now
View Specifications

Area

~37 m²

Bedrooms

2

Bathrooms

1

Kitchen

Kitchenette

Flexible living, simply done.

The Clearing is the most straightforward way into the expandable range. Around 37 square metres open out on site into two bedrooms, a kitchenette, a full bathroom and a light-filled living space.

It is designed for buyers who want a complete, comfortable small home — a guest cabin, off-grid-ready retreat or relocatable residence — without the cost or timeline of a conventional build.

Design Philosophy

Everything you need, nothing you don't.

Every square metre earns its place: room to sleep, cook, bathe and gather, with soft-close cabinetry, a stone-look benchtop and durable flooring that wears gracefully.

The expandable format keeps transport simple and the on-site footprint efficient, so the home travels compact and opens into a calm, practical plan.

The Clearing lifestyle image

Lifestyle

A complete small home, ready to relocate.

Two bedrooms and a full fit-out make The Clearing equally suited to guest stays, holiday lets, rural retreats and compact everyday living.

Two-bedroom plan

A real separation of spaces in an efficient, relocatable footprint.

Complete fit-out

Kitchenette, full bathroom and service-ready connections from the outset.

Cost-effective entry

The most accessible way into flexible, relocatable living.

Off-grid ready

A practical base for independent systems, subject to design.

Key Features

Considered, down to the detail.

Kitchenette with storage

Stone-look benchtop, soft-close cabinetry and space for laundry and a dishwasher.

Full bathroom

Walk-in shower, vanity and soft-close WC, ready once services are connected.

Flexible bedrooms

Two bedrooms, with the option to remove the dividing wall for one larger room.

Double-glazed windows

Aluminium-framed glazing with fly screens throughout for everyday comfort.

Interior

A practical interior, ready to be resolved around your use.

The layout, inclusions and finish level can be reviewed during enquiry so the model is matched to the site, intended use and required service connections.

The Clearing — interior view 1
The Clearing — interior view 2
The Clearing — interior view 3
The Clearing — interior view 4
The Clearing — interior view 5

Floor Plan

Every metre, considered.

The Clearing floor plan

Indicative floor plan supplied for The Clearing.

The ModuHaus Difference

Why ModuHaus

A ModuHaus enquiry starts with the site and intended use, then works back to the right model, fit-out and approval pathway.

01

Curated product range

Each expandable model is positioned around real use cases rather than supplier catalogue language.

02

Transport-aware planning

Foldable formats help simplify freight and reduce on-site disruption.

03

Clear next steps

Access, services, fit-out options and approvals can be reviewed before purchase.

04

Guided enquiry

Our team helps you understand suitability, pricing and documentation before decisions are rushed.

Key Information

The essentials, at a glance.

Configuration

2 bedrooms

Area

Approx. 37 m²

Format

Expandable, opens on site

Collection

Expandable Homes

Ideal forGuest cabinHoliday accommodationOff-grid-ready retreatCompact living

Specifications

The details that shape the model.

Source-backed information for early planning. Final inclusions, dimensions and documentation should be confirmed during enquiry.

Configuration

2 bedrooms · 1 bathroom · kitchenette · living

Internal area

Approx. 37 m² once expanded

Set-up footprint

Approx. 5.85 m × 6.3 m

Format

Expandable — ships compact, opens on site

Option

Dividing bedroom wall can be removed for one larger room

Planning Notes

What to confirm before the site is ready.

Delivery & Installation

Most foldable and expandable units are delivered in a compact folded format for efficient transport, then opened and installed on site. Setup timing depends on access, model selection, site conditions and required trades; typical setup is reviewed during enquiry.

Utilities

Water, electrical, plumbing and other service connections must be completed by licensed trades. HVAC, solar and off-grid systems are planned separately unless specifically quoted.

Warranty & Support

Warranty and support terms should be confirmed before purchase. Current product guidance includes support for structure, weatherproofing, internal fittings and manufacturing defects.

Council & Compliance

Approval requirements vary by council, site and intended use. Documentation can be reviewed during the enquiry process, and any final approvals, inspections or site-specific reports should be confirmed before purchase.

Standard Inclusions

Considered, and included.

Two-Bedroom LayoutKitchenette with StorageStone-Look BenchtopFull BathroomDouble-Glazed WindowsSoft-Close JoineryRemovable Dividing Wall (option)

Product FAQs

Common questions, answered simply.

How does The Clearing differ from The Aspect?

Both share the same two-bedroom expandable format. The Clearing is the practical, value-focused model; The Aspect adds premium kitchen, bathroom and exterior finishes.

Can the layout be opened up?

Yes. The dividing bedroom wall can be omitted to create a single, larger room — a good option for studios or open living. We'll confirm the right layout during consultation.

What Affects Final Pricing

A guide price, then a plan that fits your site.

The figure shown is an indicative starting point. Your final investment is shaped during consultation — these are the details that move it.

Your site — delivery access, ground conditions and how much site preparation is needed.

Service connections — bringing power, water and wastewater to the home, completed by licensed trades.

Council & approvals — the documentation and pathway your council, zoning and intended use require.

Configuration & finishes — layout adjustments, upgraded fixtures, cladding or interior options.

Delivery distance — freight from our partner facility to your land.

Outdoor & extras — decks, stairs, terraces, furniture or styling, where requested.

What Happens Next

From first conversation to keys.

01

Enquire

Tell us about your land, intended use and timing. We confirm whether this model is a natural fit.

02

Consult

We review access, services and the approval pathway together, and shape the home around how you'll live.

03

Proposal

You receive a clear, itemised proposal — inclusions, delivery and the route to approval, with no surprises.

04

Delivery

Supplier, delivery and placement requirements are confirmed through project review, then connection is completed by licensed trades where required.

Site Suitability Matters

The right modular solution still needs the right site conditions.

A modular solution is only suitable if the site can support delivery, access, installation and the intended use. Before final pricing or delivery, key site details may need to be reviewed.

delivery access width and driveway slope

crane or truck access and installation space

ground conditions and site preparation

services, utilities and connection requirements

local council controls and intended use

bushfire, flood, wind or coastal exposure where relevant

Site suitability guidance is preliminary and does not replace advice from builders, engineers, certifiers, planners, installers or council.

Approvals, Delivery & Installation

Council requirements, permits, engineering, delivery and installation conditions can vary by property, council area, intended use and product type. Information on this website is general in nature and should not be treated as building, legal, planning, engineering or financial advice. Confirm requirements with the relevant council, certifier, builder, installer, engineer or other qualified professional before making a purchase or project decision.

Consultation

Start Your ModuHaus Consultation

Tell us about your vision and our team will help you find the most suitable modular living solution.

We’ll use your details to review your enquiry and contact you about your ModuHaus project. Your project details are not displayed publicly.

Step 1 of 617%

What best describes you?

Enquiries

Explore whether The Clearing suits your site.

Share your location, access, intended use and preferred timing. We will help you understand suitability, pricing and the next steps.

Next Collection

The Atelier

Enquire