
Collection 30
The Atelier
Compact plug-and-play studio
From$26,500AUD
Indicative starting price. Final pricing depends on site, delivery, inclusions and approvals.
Area
~13.5 m²
Layout
Studio
Bathroom
1
Kitchenette
1
A complete room, ready to place.
The Atelier is the simplest home in the range. There is nothing to unfold — it arrives as a finished, self-contained studio of around 13.5 square metres, ready to be levelled and connected to services.
Inside, a kitchenette, a full bathroom and a flexible living-sleeping space make it a genuine room of one's own: a home office, guest studio, weekender or quiet retreat at the end of the garden.
Design Philosophy
Small footprint, real presence.
Compact does not mean compromised. The Atelier is fully fitted — durable flooring, double-glazed windows, soft-close joinery and a proper bathroom — so it feels like a considered space rather than a temporary box.
Because it needs no unfolding, it suits tighter sites and faster timelines: position it, level it, connect it, and it's ready to use.

Lifestyle
A versatile space, close to home.
The plug-and-play format makes The Atelier an easy yes for studios, offices, guest rooms and weekenders where simplicity matters.
No unfolding
Arrives complete — levelled, connected and ready to use.
Fully self-contained
Kitchenette and full bathroom within a compact footprint.
Fits tight sites
A small footprint suits courtyards, narrow access and quick placement.
A room of your own
Office, studio, guest space or retreat, steps from the main home.
Key Features
Considered, down to the detail.
Fitted kitchenette
1.2 m benchtop with stone-look surface, soft-close cabinetry and overhead storage.
Full bathroom
Walk-in shower, vanity and soft-close WC in a properly finished wet area.
Durable, finished interior
Timber-look vinyl flooring, double-glazing and a calm, neutral palette.
Plug-and-play setup
No unfolding — level the unit and connect services via licensed trades.
Interior
A practical interior, ready to be resolved around your use.
The layout, inclusions and finish level can be reviewed during enquiry so the model is matched to the site, intended use and required service connections.



Floor Plan
Every metre, considered.

Indicative floor plan supplied for The Atelier.
The ModuHaus Difference
Why ModuHaus
A ModuHaus enquiry starts with the site and intended use, then works back to the right model, fit-out and approval pathway.
01
Curated product range
Each expandable model is positioned around real use cases rather than supplier catalogue language.
02
Transport-aware planning
Foldable formats help simplify freight and reduce on-site disruption.
03
Clear next steps
Access, services, fit-out options and approvals can be reviewed before purchase.
04
Guided enquiry
Our team helps you understand suitability, pricing and documentation before decisions are rushed.
Key Information
The essentials, at a glance.
Configuration
Studio · 1 bathroom
Area
Approx. 13.5 m²
Format
Plug-and-play, no unfolding
Collection
Expandable Homes
Specifications
The details that shape the model.
Source-backed information for early planning. Final inclusions, dimensions and documentation should be confirmed during enquiry.
Configuration
Studio · kitchenette · bathroom
Internal area
Approx. 13.5 m²
Footprint
Approx. 5.85 m × 2.25 m
Format
Plug-and-play — arrives complete, no unfolding
Setup
Level on site, then connect services via licensed trades
Planning Notes
What to confirm before the site is ready.
Delivery & Installation
Most foldable and expandable units are delivered in a compact folded format for efficient transport, then opened and installed on site. Setup timing depends on access, model selection, site conditions and required trades; typical setup is reviewed during enquiry.
Utilities
Water, electrical, plumbing and other service connections must be completed by licensed trades. HVAC, solar and off-grid systems are planned separately unless specifically quoted.
Warranty & Support
Warranty and support terms should be confirmed before purchase. Current product guidance includes support for structure, weatherproofing, internal fittings and manufacturing defects.
Council & Compliance
Approval requirements vary by council, site and intended use. Documentation can be reviewed during the enquiry process, and any final approvals, inspections or site-specific reports should be confirmed before purchase.
Standard Inclusions
Considered, and included.
Product FAQs
Common questions, answered simply.
Does The Atelier expand or unfold?
No. It arrives as a complete, self-contained studio. It is levelled on site and connected to services — there is no unfolding step.
Is it suitable as a home office or guest room?
Yes. With a kitchenette and full bathroom in a compact footprint, it works well as an office, studio, guest room or weekender, subject to your site and local requirements.
What Affects Final Pricing
A guide price, then a plan that fits your site.
The figure shown is an indicative starting point. Your final investment is shaped during consultation — these are the details that move it.
Your site — delivery access, ground conditions and how much site preparation is needed.
Service connections — bringing power, water and wastewater to the home, completed by licensed trades.
Council & approvals — the documentation and pathway your council, zoning and intended use require.
Configuration & finishes — layout adjustments, upgraded fixtures, cladding or interior options.
Delivery distance — freight from our partner facility to your land.
Outdoor & extras — decks, stairs, terraces, furniture or styling, where requested.
What Happens Next
From first conversation to keys.
01
Enquire
Tell us about your land, intended use and timing. We confirm whether this model is a natural fit.
02
Consult
We review access, services and the approval pathway together, and shape the home around how you'll live.
03
Proposal
You receive a clear, itemised proposal — inclusions, delivery and the route to approval, with no surprises.
04
Delivery
Supplier, delivery and placement requirements are confirmed through project review, then connection is completed by licensed trades where required.
Site Suitability Matters
The right modular solution still needs the right site conditions.
A modular solution is only suitable if the site can support delivery, access, installation and the intended use. Before final pricing or delivery, key site details may need to be reviewed.
delivery access width and driveway slope
crane or truck access and installation space
ground conditions and site preparation
services, utilities and connection requirements
local council controls and intended use
bushfire, flood, wind or coastal exposure where relevant
Site suitability guidance is preliminary and does not replace advice from builders, engineers, certifiers, planners, installers or council.
Approvals, Delivery & Installation
Council requirements, permits, engineering, delivery and installation conditions can vary by property, council area, intended use and product type. Information on this website is general in nature and should not be treated as building, legal, planning, engineering or financial advice. Confirm requirements with the relevant council, certifier, builder, installer, engineer or other qualified professional before making a purchase or project decision.
Consultation
Start Your ModuHaus Consultation
Tell us about your vision and our team will help you find the most suitable modular living solution.
We’ll use your details to review your enquiry and contact you about your ModuHaus project. Your project details are not displayed publicly.
What best describes you?
Enquiries
Explore whether The Atelier suits your site.
Share your location, access, intended use and preferred timing. We will help you understand suitability, pricing and the next steps.
Next Collection
The Haven