
Collection 28
The Aspect
Premium two-bedroom expandable home
From$44,500AUD
Indicative starting price. Final pricing depends on site, delivery, inclusions and approvals.
Area
~37 m²
Bedrooms
2
Bathrooms
1
Kitchen
L-shaped
The expandable home, quietly elevated.
The Aspect takes the practical, fast-to-deploy format of an expandable home and lifts every surface you touch. Around 37 square metres of considered space opens out on site into two bedrooms, a generous kitchen and a full bathroom.
It is for buyers who want the freedom of a relocatable home without the compromise — a refined retreat, guest house or compact residence that feels designed rather than supplied.
Design Philosophy
Refinement in the details that matter.
The difference is in the hand-feel: an L-shaped kitchen with a stone-look benchtop and soft-close joinery, satin-black tapware, a full walk-in shower, tinted double-glazing and plush flooring underfoot.
Outside, overhanging eaves and woodgrain-effect cladding give The Aspect a calm, architectural presence that settles into a garden or a rural outlook with equal ease.

Lifestyle
A relocatable home that feels permanent.
Two bedrooms and elevated finishes make The Aspect at home as a guest residence, rural retreat, short-stay rental or compact main dwelling.
Two private bedrooms
Genuine separation for family, guests or a work-from-home study.
Elevated kitchen & bath
Upgraded joinery, stone-look benchtops and a full walk-in shower.
Arrives in days
Ships compact and opens out on site — settled in a fraction of a traditional build.
Designed to relocate
Engineered to be set down gently today and moved with you later.
Key Features
Considered, down to the detail.
L-shaped kitchen
Stone-look benchtop, soft-close joinery, satin-black tapware and a generous sink.
Full walk-in shower
Frameless glass, monsoon head and satin-black hardware in a tiled bathroom.
Tinted double-glazing
Thermally considered windows with security and fly screens throughout.
Refined exterior
Woodgrain-effect cladding with overhanging eaves for a softer, architectural line.
Interior
A practical interior, ready to be resolved around your use.
The layout, inclusions and finish level can be reviewed during enquiry so the model is matched to the site, intended use and required service connections.



Floor Plan
Every metre, considered.

The ModuHaus Difference
Why ModuHaus
A ModuHaus enquiry starts with the site and intended use, then works back to the right model, fit-out and approval pathway.
01
Curated product range
Each expandable model is positioned around real use cases rather than supplier catalogue language.
02
Transport-aware planning
Foldable formats help simplify freight and reduce on-site disruption.
03
Clear next steps
Access, services, fit-out options and approvals can be reviewed before purchase.
04
Guided enquiry
Our team helps you understand suitability, pricing and documentation before decisions are rushed.
Key Information
The essentials, at a glance.
Configuration
2 bedrooms
Area
Approx. 37 m²
Format
Expandable, opens on site
Collection
Expandable Homes
Specifications
The details that shape the model.
Source-backed information for early planning. Final inclusions, dimensions and documentation should be confirmed during enquiry.
Configuration
2 bedrooms · 1 bathroom · kitchen · living
Internal area
Approx. 37 m² once expanded
Set-up footprint
Approx. 5.85 m × 6.3 m
Format
Expandable — ships compact, opens on site
Finish level
Premium — upgraded kitchen, bathroom, cladding and flooring
Planning Notes
What to confirm before the site is ready.
Delivery & Installation
Most foldable and expandable units are delivered in a compact folded format for efficient transport, then opened and installed on site. Setup timing depends on access, model selection, site conditions and required trades; typical setup is reviewed during enquiry.
Utilities
Water, electrical, plumbing and other service connections must be completed by licensed trades. HVAC, solar and off-grid systems are planned separately unless specifically quoted.
Warranty & Support
Warranty and support terms should be confirmed before purchase. Current product guidance includes support for structure, weatherproofing, internal fittings and manufacturing defects.
Council & Compliance
Approval requirements vary by council, site and intended use. Documentation can be reviewed during the enquiry process, and any final approvals, inspections or site-specific reports should be confirmed before purchase.
Standard Inclusions
Considered, and included.
Product FAQs
Common questions, answered simply.
How is The Aspect set up on site?
It arrives compact and opens out on site. Setup is typically completed by a small team over a couple of days; licensed trades complete the plumbing and electrical connections.
What makes it 'premium' versus the standard model?
The Aspect carries upgraded kitchen and bathroom finishes, satin-black tapware, tinted double-glazing, refined cladding and plush flooring — the considered details you live with every day.
What Affects Final Pricing
A guide price, then a plan that fits your site.
The figure shown is an indicative starting point. Your final investment is shaped during consultation — these are the details that move it.
Your site — delivery access, ground conditions and how much site preparation is needed.
Service connections — bringing power, water and wastewater to the home, completed by licensed trades.
Council & approvals — the documentation and pathway your council, zoning and intended use require.
Configuration & finishes — layout adjustments, upgraded fixtures, cladding or interior options.
Delivery distance — freight from our partner facility to your land.
Outdoor & extras — decks, stairs, terraces, furniture or styling, where requested.
What Happens Next
From first conversation to keys.
01
Enquire
Tell us about your land, intended use and timing. We confirm whether this model is a natural fit.
02
Consult
We review access, services and the approval pathway together, and shape the home around how you'll live.
03
Proposal
You receive a clear, itemised proposal — inclusions, delivery and the route to approval, with no surprises.
04
Delivery
Supplier, delivery and placement requirements are confirmed through project review, then connection is completed by licensed trades where required.
Site Suitability Matters
The right modular solution still needs the right site conditions.
A modular solution is only suitable if the site can support delivery, access, installation and the intended use. Before final pricing or delivery, key site details may need to be reviewed.
delivery access width and driveway slope
crane or truck access and installation space
ground conditions and site preparation
services, utilities and connection requirements
local council controls and intended use
bushfire, flood, wind or coastal exposure where relevant
Site suitability guidance is preliminary and does not replace advice from builders, engineers, certifiers, planners, installers or council.
Approvals, Delivery & Installation
Council requirements, permits, engineering, delivery and installation conditions can vary by property, council area, intended use and product type. Information on this website is general in nature and should not be treated as building, legal, planning, engineering or financial advice. Confirm requirements with the relevant council, certifier, builder, installer, engineer or other qualified professional before making a purchase or project decision.
Consultation
Start Your ModuHaus Consultation
Tell us about your vision and our team will help you find the most suitable modular living solution.
We’ll use your details to review your enquiry and contact you about your ModuHaus project. Your project details are not displayed publicly.
What best describes you?
Enquiries
Explore whether The Aspect suits your site.
Share your location, access, intended use and preferred timing. We will help you understand suitability, pricing and the next steps.
Next Collection
The Clearing