
Collection 29
Accessible Portable Toilet
Wheelchair-accessible amenity
From$12,430AUD
Indicative starting price. Final pricing depends on site, delivery, inclusions and approvals.
Floor area
~6.4 m²
Dimensions
2.16 × 2.96 m
Accessible toilet
1
Inclusive access, without permanent works.
The Accessible Portable Toilet provides a generous, open-plan amenity designed around wheelchair access — a more inclusive facility for public areas, events and project sites that a standard unit can't serve.
A wider entrance and clear internal floor space make everyday use easier, with a layout prepared for grab rails and ramp access.
Design Philosophy
Designed so everyone is considered.
Accessibility shouldn't depend on a finished building. This unit brings a wider, more open amenity to temporary and outdoor settings, built on the same durable, insulated construction as the rest of the range.
It's a practical way to make a site, event or public space more welcoming from the day it opens.

Lifestyle
Accessible facilities, wherever they're needed.
A larger, open-plan amenity that arrives ready to position — inclusive access for places that don't have it yet.
Public & community spaces
More inclusive restroom access for parks, venues and community facilities.
Events & festivals
Accessible facilities for outdoor functions and temporary venues.
Worksites & projects
A durable accessible amenity for construction and commercial sites.
Accessibility-ready
A wider entry and open floor plan prepared for grab rails and ramp access.
Key Features
Considered, down to the detail.
Wider accessible entrance
A broad entry designed to make wheelchair access easier.
Open internal floor space
A clear, generous layout with room to manoeuvre.
Accessibility-ready layout
Prepared for grab rails and ramp access, to suit your site.
Steel-frame structure
A durable frame engineered for transport and high-use settings.
Insulated wall panels
50 mm flame-retardant EPS panels for a sturdier interior.
Easy-clean interior
Wear-resistant PVC flooring made for constant public use.
Interior
Open, clear and easy to move within.
A generous internal floor area and wide entrance give room to manoeuvre, finished with durable, easy-clean surfaces suited to high-use public settings.



Floor Plan
Every metre, considered.

The ModuHaus Difference
Why ModuHaus
An accessible amenity, designed, made and delivered with the same considered care as our homes.
01
Built to last
A steel frame and insulated panels for years of dependable outdoor service.
02
Considered layout
A wider entry and open floor plan designed for genuine ease of use.
03
Utility-ready
Prepared for water, waste and power for a straightforward final connection.
04
Guided, end to end
One team beside you, from first enquiry to placement on site.
Key Information
The essentials, at a glance.
Configuration
Accessible toilet
Footprint
2.16 × 2.96 m
Approx. weight
1,050 kg
Collection
Toilets & Bathrooms
Specifications
The details that shape the model.
Source-backed information for early planning. Final inclusions, dimensions and documentation should be confirmed during enquiry.
Installed Size
2.16 m × 2.96 m × 2.36 m (W × L × H)
Shipping Size
2.16 m × 2.96 m × 2.36 m
Approx. Weight
1,050 kg
Frame
Steel-frame structure
Walls
50 mm flame-retardant EPS insulated panels
Flooring
2 mm wear-resistant PVC
Door
Wide accessible entrance
Finish
White with black frame
Connections
Water, waste & power ready
Optional Upgrades
Configure the details that matter.
Planning Notes
What to confirm before the site is ready.
Delivery & Installation
The unit is supplied as a prefabricated structure, ready to position. On-site setup is typically around a day where service connections are arranged ahead of delivery. A crane or forklift may be required for placement; typical lead time is approximately 2–3 months, confirmed at enquiry.
Utilities
The unit is prepared for water, waste and electrical connection. All plumbing, drainage and electrical work must be completed by licensed trades.
Warranty & Support
Indicative support covers the external structure and weatherproofing for 3 years and internal fittings for 1 year. Final warranty terms should be confirmed before purchase.
Council & Compliance
This unit is designed with accessibility in mind, but accessibility requirements vary by site, intended use and the applicable Australian standards and council rules. Please confirm accessibility compliance for your specific use case before purchase — we can help you understand what to check.
Standard Inclusions
Considered, and included.
Product FAQs
Common questions, answered simply.
What makes this unit suitable for wheelchair access?
It has a larger internal footprint, a wider entrance and an open, wheelchair-friendly layout prepared for grab rails and ramp access. Final accessibility compliance should be confirmed for your site and intended use.
Can it be used for public events and parks?
Yes — it suits public facilities, parks, events, worksites and other settings that need more inclusive sanitation.
Does it require plumbing and electrical work?
Yes — water, waste and electrical connections must be completed by licensed trades.
Transparent Pricing
From pricing gives a starting point, not the final project cost.
Prices shown on ModuHaus are indicative starting prices unless clearly stated otherwise. Final pricing can vary depending on product specification, site conditions, delivery location, installation scope, service connections and approval pathway.
model, size, layout and inclusions
finish level, upgrades and custom requirements
delivery distance, transport and crane requirements
site access, preparation and installation scope
service connections, engineering and certification
council or approval pathway requirements
What Happens After Enquiry
A considered review before quote or delivery discussions.
After you submit an enquiry, the ModuHaus team reviews your project details before recommending the most suitable next step. We do not treat enquiry forms as instant final quotes.
01
We receive your enquiry
Your message or Project Plan is saved for review by the ModuHaus team.
02
We review fit and context
We look at location, intended use, budget range, timing and any product recommendation.
03
We may request site details
Photos, access information, service requirements or council context may be needed before the next step.
04
You receive next-step guidance
The response may point toward a product, supplier pathway, consultation or further suitability review.
Site Suitability Matters
The right modular solution still needs the right site conditions.
A modular solution is only suitable if the site can support delivery, access, installation and the intended use. Before final pricing or delivery, key site details may need to be reviewed.
delivery access width and driveway slope
crane or truck access and installation space
ground conditions and site preparation
services, utilities and connection requirements
local council controls and intended use
bushfire, flood, wind or coastal exposure where relevant
Site suitability guidance is preliminary and does not replace advice from builders, engineers, certifiers, planners, installers or council.
Approvals, Delivery & Installation
Council requirements, permits, engineering, delivery and installation conditions can vary by property, council area, intended use and product type. Information on this website is general in nature and should not be treated as building, legal, planning, engineering or financial advice. Confirm requirements with the relevant council, certifier, builder, installer, engineer or other qualified professional before making a purchase or project decision.
Consultation
Start Your ModuHaus Consultation
Tell us about your vision and our team will help you find the most suitable modular living solution.
We’ll use your details to review your enquiry and contact you about your ModuHaus project. Your project details are not displayed publicly.
What best describes you?
Enquiries
Planning accessible facilities?
Tell us about the site and how it will be used. We'll help you confirm suitability, the connections required and what to check for accessibility.
Next Collection
6M Container Home - Empty