
Collection 17
6M Container Home - Empty
Flexible foldable home shell
From$32,286AUD
Indicative starting price. Final pricing depends on site, delivery, inclusions and approvals.
Expanded
5.96 x 5.96 m
Fit-out
Empty shell
Use
Flexible
A strong modular shell, ready to become yours.
The 6M Container Home - Empty gives you a transportable structure that can be adapted around your own interior plan.
Its steel-framed foldable construction, insulated panels, durable flooring and aluminium windows and doors make it a practical base for compact accommodation, a studio, an office or a temporary site room.
Design Philosophy
Flexible before it is fixed.
This model is for buyers who want the structure first and the final layout second.
By keeping the internal plan open, the unit can be reviewed around the site, intended use and preferred fit-out during enquiry.

Lifestyle
One compact structure, many possible uses.
A useful starting point for a guest room, studio, office, temporary shelter or compact dwelling shell.
Custom interior
A flexible shell for buyers who want to control the internal layout.
Expanded footprint
Folds for transport, then opens to create a larger usable area.
Durable base
Galvanised steel frame with insulated wall panels.
Practical materials
Wear-resistant flooring and aluminium windows and doors.
Key Features
Considered, down to the detail.
6-metre foldable design
Compact during transport and expanded on site.
Galvanised steel frame
A durable structure for a range of uses.
Insulated wall panels
Fire-resistant EPS insulated wall panels.
Customisable layout
Kitchen, storage and finish options can be reviewed.
Interior
A practical interior, ready to be resolved around your use.
The layout, inclusions and finish level can be reviewed during enquiry so the model is matched to the site, intended use and required service connections.



Floor Plan
Every metre, considered.

Indicative floor plan supplied for 6M Container Home - Empty.
The ModuHaus Difference
Why ModuHaus
A ModuHaus enquiry starts with the site and intended use, then works back to the right model, fit-out and approval pathway.
01
Curated product range
Each expandable model is positioned around real use cases rather than supplier catalogue language.
02
Transport-aware planning
Foldable formats help simplify freight and reduce on-site disruption.
03
Clear next steps
Access, services, fit-out options and approvals can be reviewed before purchase.
04
Guided enquiry
Our team helps you understand suitability, pricing and documentation before decisions are rushed.
Key Information
The essentials, at a glance.
Configuration
Empty shell
Footprint
5.96 m x 5.96 m expanded
Approx. weight
2,750 kg
Collection
Expandable Homes
Specifications
The details that shape the model.
Source-backed information for early planning. Final inclusions, dimensions and documentation should be confirmed during enquiry.
Folded Size
5.96 m x 2.2 m x 2.5 m
Expanded Size
5.96 m x 5.96 m x 2.5 m
Approx. Weight
2,750 kg
Frame
Galvanised steel structure
Walls
Fire-resistant EPS insulated panels
Flooring
High-quality wear-resistant material
Windows
Thermal break aluminium windows
Doors
Aluminium alloy door
Optional Upgrades
Configure the details that matter.
Planning Notes
What to confirm before the site is ready.
Delivery & Installation
Most foldable and expandable units are delivered in a compact folded format for efficient transport, then opened and installed on site. Setup timing depends on access, model selection, site conditions and required trades; typical setup is reviewed during enquiry.
Utilities
Water, electrical, plumbing and other service connections must be completed by licensed trades. HVAC, solar and off-grid systems are planned separately unless specifically quoted.
Warranty & Support
Warranty and support terms should be confirmed before purchase. Current product guidance includes support for structure, weatherproofing, internal fittings and manufacturing defects.
Council & Compliance
Approval requirements vary by council, site and intended use. Documentation can be reviewed during the enquiry process, and any final approvals, inspections or site-specific reports should be confirmed before purchase.
Standard Inclusions
Considered, and included.
Transparent Pricing
From pricing gives a starting point, not the final project cost.
Prices shown on ModuHaus are indicative starting prices unless clearly stated otherwise. Final pricing can vary depending on product specification, site conditions, delivery location, installation scope, service connections and approval pathway.
model, size, layout and inclusions
finish level, upgrades and custom requirements
delivery distance, transport and crane requirements
site access, preparation and installation scope
service connections, engineering and certification
council or approval pathway requirements
What Happens After Enquiry
A considered review before quote or delivery discussions.
After you submit an enquiry, the ModuHaus team reviews your project details before recommending the most suitable next step. We do not treat enquiry forms as instant final quotes.
01
We receive your enquiry
Your message or Project Plan is saved for review by the ModuHaus team.
02
We review fit and context
We look at location, intended use, budget range, timing and any product recommendation.
03
We may request site details
Photos, access information, service requirements or council context may be needed before the next step.
04
You receive next-step guidance
The response may point toward a product, supplier pathway, consultation or further suitability review.
Site Suitability Matters
The right modular solution still needs the right site conditions.
A modular solution is only suitable if the site can support delivery, access, installation and the intended use. Before final pricing or delivery, key site details may need to be reviewed.
delivery access width and driveway slope
crane or truck access and installation space
ground conditions and site preparation
services, utilities and connection requirements
local council controls and intended use
bushfire, flood, wind or coastal exposure where relevant
Site suitability guidance is preliminary and does not replace advice from builders, engineers, certifiers, planners, installers or council.
Approvals, Delivery & Installation
Council requirements, permits, engineering, delivery and installation conditions can vary by property, council area, intended use and product type. Information on this website is general in nature and should not be treated as building, legal, planning, engineering or financial advice. Confirm requirements with the relevant council, certifier, builder, installer, engineer or other qualified professional before making a purchase or project decision.
Consultation
Start Your ModuHaus Consultation
Tell us about your vision and our team will help you find the most suitable modular living solution.
We’ll use your details to review your enquiry and contact you about your ModuHaus project. Your project details are not displayed publicly.
What best describes you?
Enquiries
Explore whether 6M Container Home - Empty suits your site.
Share your location, access, intended use and preferred timing. We will help you understand suitability, pricing and the next steps.
Next Collection
13FT Container Office