
Collection 27
6M Container Home with 2 Bedrooms
Two-bedroom compact foldable home
From$34,289AUD
Indicative starting price. Final pricing depends on site, delivery, inclusions and approvals.
Area
~36 m2
Expanded
5.96 x 5.8 m
Bedrooms
2
Bathroom
1
Two bedrooms in a compact modular footprint.
This 6M model provides approximately 36 m2 of usable space when expanded, including two bedrooms, kitchen and bathroom.
It is designed for buyers who need a smaller self-contained dwelling, backyard accommodation, holiday rental unit, office or flexible studio, subject to council and site requirements.
Design Philosophy
The essentials, planned efficiently.
Every square metre has a job: sleeping, cooking, bathing or gathering. The value is in keeping the plan compact without stripping away daily function.
The foldable format supports efficient delivery while still opening into a practical two-bedroom layout on site.

Lifestyle
A small home with real separation.
Two bedrooms make the model useful for guests, family overflow, work-stay arrangements or compact independent living.
Two bedrooms
A more private layout than an open studio or single-room pod.
Kitchen included
Open kitchen with cabinets included in the source specification.
Full bathroom
Bathroom with toilet, shower and vanity functionality.
Compact living
Approx. 36 m2 of expanded usable space.
Key Features
Considered, down to the detail.
Self-contained layout
Two bedrooms, kitchen and bathroom in one compact format.
Double-glazed windows
Insulated tempered glass supports a more comfortable interior.
Pre-installed cabinetry
Kitchen cabinetry is included in the source specification.
Utility-ready provisions
Water and electrical provisions are planned for licensed connection.
Interior
A practical interior, ready to be resolved around your use.
The layout, inclusions and finish level can be reviewed during enquiry so the model is matched to the site, intended use and required service connections.




The ModuHaus Difference
Why ModuHaus
A ModuHaus enquiry starts with the site and intended use, then works back to the right model, fit-out and approval pathway.
01
Curated product range
Each expandable model is positioned around real use cases rather than supplier catalogue language.
02
Transport-aware planning
Foldable formats help simplify freight and reduce on-site disruption.
03
Clear next steps
Access, services, fit-out options and approvals can be reviewed before purchase.
04
Guided enquiry
Our team helps you understand suitability, pricing and documentation before decisions are rushed.
Key Information
The essentials, at a glance.
Configuration
2 bedrooms
Area
Approx. 36 m2
Footprint
5.96 m x 5.8 m expanded
Collection
Expandable Homes
Specifications
The details that shape the model.
Source-backed information for early planning. Final inclusions, dimensions and documentation should be confirmed during enquiry.
Folded Size
5.96 m x 2.2 m x 2.5 m
Expanded Size
5.96 m x 5.8 m x 2.5 m
Living Area
Approx. 36 m2
Approx. Weight
3,500 kg
Frame
Galvanised steel structure
Walls
Fire-resistant EPS insulated panels
Flooring
2 mm wear-resistant PVC
Windows
Double-glazed insulated tempered glass
Kitchen
1 kitchen with cabinets
Bathroom
Wet/dry separated bathroom, cabinet, toilet and showerhead
Optional Upgrades
Configure the details that matter.
Planning Notes
What to confirm before the site is ready.
Delivery & Installation
Most foldable and expandable units are delivered in a compact folded format for efficient transport, then opened and installed on site. Setup timing depends on access, model selection, site conditions and required trades; typical setup is reviewed during enquiry.
Utilities
Water, electrical, plumbing and other service connections must be completed by licensed trades. HVAC, solar and off-grid systems are planned separately unless specifically quoted.
Warranty & Support
Warranty and support terms should be confirmed before purchase. Current product guidance includes support for structure, weatherproofing, internal fittings and manufacturing defects.
Council & Compliance
Approval requirements vary by council, site and intended use. Documentation can be reviewed during the enquiry process, and any final approvals, inspections or site-specific reports should be confirmed before purchase.
Standard Inclusions
Considered, and included.
Product FAQs
Common questions, answered simply.
How is the home delivered?
It is delivered in a folded format for efficient transport, then expanded and installed on site. Setup timing depends on access and site conditions.
Can it connect to power and water?
Yes. The unit is designed with water and electrical connection provisions. Licensed trades are required for all service connections.
Does it require council approval?
Approval requirements vary by state, council area, site and intended use. Customers should check with their local council before purchase.
Transparent Pricing
From pricing gives a starting point, not the final project cost.
Prices shown on ModuHaus are indicative starting prices unless clearly stated otherwise. Final pricing can vary depending on product specification, site conditions, delivery location, installation scope, service connections and approval pathway.
model, size, layout and inclusions
finish level, upgrades and custom requirements
delivery distance, transport and crane requirements
site access, preparation and installation scope
service connections, engineering and certification
council or approval pathway requirements
What Happens After Enquiry
A considered review before quote or delivery discussions.
After you submit an enquiry, the ModuHaus team reviews your project details before recommending the most suitable next step. We do not treat enquiry forms as instant final quotes.
01
We receive your enquiry
Your message or Project Plan is saved for review by the ModuHaus team.
02
We review fit and context
We look at location, intended use, budget range, timing and any product recommendation.
03
We may request site details
Photos, access information, service requirements or council context may be needed before the next step.
04
You receive next-step guidance
The response may point toward a product, supplier pathway, consultation or further suitability review.
Site Suitability Matters
The right modular solution still needs the right site conditions.
A modular solution is only suitable if the site can support delivery, access, installation and the intended use. Before final pricing or delivery, key site details may need to be reviewed.
delivery access width and driveway slope
crane or truck access and installation space
ground conditions and site preparation
services, utilities and connection requirements
local council controls and intended use
bushfire, flood, wind or coastal exposure where relevant
Site suitability guidance is preliminary and does not replace advice from builders, engineers, certifiers, planners, installers or council.
Approvals, Delivery & Installation
Council requirements, permits, engineering, delivery and installation conditions can vary by property, council area, intended use and product type. Information on this website is general in nature and should not be treated as building, legal, planning, engineering or financial advice. Confirm requirements with the relevant council, certifier, builder, installer, engineer or other qualified professional before making a purchase or project decision.
Consultation
Start Your ModuHaus Consultation
Tell us about your vision and our team will help you find the most suitable modular living solution.
We’ll use your details to review your enquiry and contact you about your ModuHaus project. Your project details are not displayed publicly.
What best describes you?
Enquiries
Explore whether 6M Container Home with 2 Bedrooms suits your site.
Share your location, access, intended use and preferred timing. We will help you understand suitability, pricing and the next steps.
Next Collection
The Aspect