
Collection 21
30FT Class 1A Compact House - 2 Bedroom
Two-bedroom compact house
From$84,200AUD
Indicative starting price. Final pricing depends on site, delivery, inclusions and approvals.
Area
~63 m2
Expanded
9.0 x 7.0 m
Bedrooms
2
Bathroom
1
A more complete compact house pathway.
The 30FT Class 1A Compact House is intended for buyers seeking a more complete and compliance-conscious modular housing solution.
It is designed around a Class 1A certification pathway in relation to NCC and BCA requirements, subject to site-specific approvals, final documentation and intended use.
Design Philosophy
A compact home with documentation in mind.
This model is positioned differently from a basic transportable shell. It is for buyers who need a more formal pathway, clearer documentation and a two-bedroom layout suited to residential planning.
Site conditions, overlays, access, installation method and local council requirements remain critical, so the enquiry process should begin before assumptions are made.

Lifestyle
Designed for more permanent intentions.
A suitable option where the project needs more than a basic pod or temporary unit.
Certification pathway
Designed around a Class 1A pathway, subject to site-specific requirements.
Approx. 63 m2
Expanded living area with two bedrooms, living, kitchen and bathroom.
Built-in planning
Includes key furniture and utility planning in the source specification.
Installation clarity
Requires a licensed builder or eligible owner-builder where permitted.
Key Features
Considered, down to the detail.
Class 1A pathway
Documentation can be reviewed during enquiry; final approvals are site-specific.
Two-bedroom layout
Includes living room, kitchen and bathroom.
PU insulated wall system
Metal carved panel with PU insulation board.
Double tempered glass
Thermal break aluminium windows with fly screens.
Interior
A practical interior, ready to be resolved around your use.
The layout, inclusions and finish level can be reviewed during enquiry so the model is matched to the site, intended use and required service connections.



Floor Plan
Every metre, considered.

Indicative floor plan supplied for 30FT Class 1A Compact House - 2 Bedroom.
The ModuHaus Difference
Why ModuHaus
A ModuHaus enquiry starts with the site and intended use, then works back to the right model, fit-out and approval pathway.
01
Curated product range
Each expandable model is positioned around real use cases rather than supplier catalogue language.
02
Transport-aware planning
Foldable formats help simplify freight and reduce on-site disruption.
03
Clear next steps
Access, services, fit-out options and approvals can be reviewed before purchase.
04
Guided enquiry
Our team helps you understand suitability, pricing and documentation before decisions are rushed.
Key Information
The essentials, at a glance.
Configuration
2 bedrooms
Area
Approx. 63 m2
Approval
Site-specific pathway
Collection
Expandable Homes
Specifications
The details that shape the model.
Source-backed information for early planning. Final inclusions, dimensions and documentation should be confirmed during enquiry.
Folded Size
9.0 m x 2.25 m x 2.9 m
Shipping Size
9.0 m x 2.25 m x 2.9 m
Expanded Size
9.0 m x 7.0 m x 2.9 m
Living Area
Approx. 63 m2
Approx. Weight
10,000 kg
Frame
Galvanised steel structure
Walls
Metal carved panel + PU insulation board
Layout
2 bedrooms, 1 living room, 1 kitchen, 1 bathroom
Included Utilities / Furniture
Cabinet, refrigerator cabinet, washing machine cabinet, bed, mattress, wardrobe, sofa
Planning Notes
What to confirm before the site is ready.
Delivery & Installation
Most foldable and expandable units are delivered in a compact folded format for efficient transport, then opened and installed on site. Setup timing depends on access, model selection, site conditions and required trades; typical setup is reviewed during enquiry.
Utilities
Water, electrical, plumbing and other service connections must be completed by licensed trades. HVAC, solar and off-grid systems are planned separately unless specifically quoted.
Warranty & Support
Warranty and support terms should be confirmed before purchase. Current product guidance includes support for structure, weatherproofing, internal fittings and manufacturing defects.
Council & Compliance
This model is designed around a Class 1A certification pathway in relation to NCC and BCA requirements. Final approval depends on the site, local council, planning overlays, access, installation method and intended use. Additional reports, assessments or approvals may be required.
Standard Inclusions
Considered, and included.
Product FAQs
Common questions, answered simply.
Is this automatically approved as a dwelling?
No. It is designed around a certification pathway, but approval requirements vary by council, site and intended use.
Who can install it?
Installation must be completed by a licensed builder, or an eligible owner-builder with the appropriate permit where permitted by law.
Transparent Pricing
From pricing gives a starting point, not the final project cost.
Prices shown on ModuHaus are indicative starting prices unless clearly stated otherwise. Final pricing can vary depending on product specification, site conditions, delivery location, installation scope, service connections and approval pathway.
model, size, layout and inclusions
finish level, upgrades and custom requirements
delivery distance, transport and crane requirements
site access, preparation and installation scope
service connections, engineering and certification
council or approval pathway requirements
What Happens After Enquiry
A considered review before quote or delivery discussions.
After you submit an enquiry, the ModuHaus team reviews your project details before recommending the most suitable next step. We do not treat enquiry forms as instant final quotes.
01
We receive your enquiry
Your message or Project Plan is saved for review by the ModuHaus team.
02
We review fit and context
We look at location, intended use, budget range, timing and any product recommendation.
03
We may request site details
Photos, access information, service requirements or council context may be needed before the next step.
04
You receive next-step guidance
The response may point toward a product, supplier pathway, consultation or further suitability review.
Site Suitability Matters
The right modular solution still needs the right site conditions.
A modular solution is only suitable if the site can support delivery, access, installation and the intended use. Before final pricing or delivery, key site details may need to be reviewed.
delivery access width and driveway slope
crane or truck access and installation space
ground conditions and site preparation
services, utilities and connection requirements
local council controls and intended use
bushfire, flood, wind or coastal exposure where relevant
Site suitability guidance is preliminary and does not replace advice from builders, engineers, certifiers, planners, installers or council.
Approvals, Delivery & Installation
Council requirements, permits, engineering, delivery and installation conditions can vary by property, council area, intended use and product type. Information on this website is general in nature and should not be treated as building, legal, planning, engineering or financial advice. Confirm requirements with the relevant council, certifier, builder, installer, engineer or other qualified professional before making a purchase or project decision.
Consultation
Start Your ModuHaus Consultation
Tell us about your vision and our team will help you find the most suitable modular living solution.
We’ll use your details to review your enquiry and contact you about your ModuHaus project. Your project details are not displayed publicly.
What best describes you?
Enquiries
Explore whether 30FT Class 1A Compact House - 2 Bedroom suits your site.
Share your location, access, intended use and preferred timing. We will help you understand suitability, pricing and the next steps.
Next Collection
12M Portable Granny Flat with 3 Bedrooms and Terrace