
Collection 22
12M Portable Granny Flat with 3 Bedrooms and Terrace
Three-bedroom expandable granny flat
From$65,500AUD
Indicative starting price. Final pricing depends on site, delivery, inclusions and approvals.
Area
~72 m2
Expanded
5.96 x 11.88 m
Bedrooms
3
Outdoor
Terrace-ready
A larger portable home with an outdoor edge.
The 12M Portable Granny Flat with 3 Bedrooms and Terrace is designed for buyers who need a larger modular living solution with stronger lifestyle presence.
With approximately 72 m2 of functional space when unfolded, the plan includes three bedrooms, open kitchen and full bathroom, with a terrace-ready layout for a more settled arrival.
Design Philosophy
Family-scale space, transportable thinking.
This model brings more internal room to the portable granny-flat category without abandoning the efficiency of a foldable format.
The terrace-ready arrangement helps the building feel more like a small home and less like a temporary unit.

Lifestyle
Space for guests, family and longer stays.
The three-bedroom layout supports family accommodation, guest stays, rental-style use or project accommodation.
Three bedrooms
A larger plan suitable for family, guest or rental-style accommodation.
Terrace-ready
Outdoor planning supports a more welcoming lifestyle edge.
Approx. 72 m2
A comfortable expanded footprint for a portable modular home.
Utility-ready
Ready for water and electrical connection by licensed trades.
Key Features
Considered, down to the detail.
Spacious 12M format
Approx. 72 m2 living area when unfolded.
Open kitchen
Pre-installed kitchen cabinets are included.
Full bathroom
A complete bathroom supports everyday accommodation use.
Double-glazed windows
Supports a more comfortable interior experience.
Interior
A practical interior, ready to be resolved around your use.
The layout, inclusions and finish level can be reviewed during enquiry so the model is matched to the site, intended use and required service connections.



The ModuHaus Difference
Why ModuHaus
A ModuHaus enquiry starts with the site and intended use, then works back to the right model, fit-out and approval pathway.
01
Curated product range
Each expandable model is positioned around real use cases rather than supplier catalogue language.
02
Transport-aware planning
Foldable formats help simplify freight and reduce on-site disruption.
03
Clear next steps
Access, services, fit-out options and approvals can be reviewed before purchase.
04
Guided enquiry
Our team helps you understand suitability, pricing and documentation before decisions are rushed.
Key Information
The essentials, at a glance.
Configuration
3 bedrooms
Area
Approx. 72 m2
Outdoor
Terrace-ready
Collection
Expandable Homes
Specifications
The details that shape the model.
Source-backed information for early planning. Final inclusions, dimensions and documentation should be confirmed during enquiry.
Folded Size
Approx. 2.2 m x 11.88 m
Expanded Size
Approx. 5.96 m x 11.88 m
Living Area
Approx. 72 m2
Layout
3 bedrooms, open kitchen, full bathroom
Walls
Fire-resistant EPS wall panels
Windows
Double-glazed windows
Kitchen
Pre-installed kitchen cabinets
Utilities
Ready for water and electrical connection
Optional Upgrades
Configure the details that matter.
Planning Notes
What to confirm before the site is ready.
Delivery & Installation
Most foldable and expandable units are delivered in a compact folded format for efficient transport, then opened and installed on site. Setup timing depends on access, model selection, site conditions and required trades; typical setup is reviewed during enquiry.
Utilities
Water, electrical, plumbing and other service connections must be completed by licensed trades. HVAC, solar and off-grid systems are planned separately unless specifically quoted.
Warranty & Support
Warranty and support terms should be confirmed before purchase. Current product guidance includes support for structure, weatherproofing, internal fittings and manufacturing defects.
Council & Compliance
Approval requirements vary by council, site and intended use. Documentation can be reviewed during the enquiry process, and any final approvals, inspections or site-specific reports should be confirmed before purchase.
Standard Inclusions
Considered, and included.
Transparent Pricing
From pricing gives a starting point, not the final project cost.
Prices shown on ModuHaus are indicative starting prices unless clearly stated otherwise. Final pricing can vary depending on product specification, site conditions, delivery location, installation scope, service connections and approval pathway.
model, size, layout and inclusions
finish level, upgrades and custom requirements
delivery distance, transport and crane requirements
site access, preparation and installation scope
service connections, engineering and certification
council or approval pathway requirements
What Happens After Enquiry
A considered review before quote or delivery discussions.
After you submit an enquiry, the ModuHaus team reviews your project details before recommending the most suitable next step. We do not treat enquiry forms as instant final quotes.
01
We receive your enquiry
Your message or Project Plan is saved for review by the ModuHaus team.
02
We review fit and context
We look at location, intended use, budget range, timing and any product recommendation.
03
We may request site details
Photos, access information, service requirements or council context may be needed before the next step.
04
You receive next-step guidance
The response may point toward a product, supplier pathway, consultation or further suitability review.
Site Suitability Matters
The right modular solution still needs the right site conditions.
A modular solution is only suitable if the site can support delivery, access, installation and the intended use. Before final pricing or delivery, key site details may need to be reviewed.
delivery access width and driveway slope
crane or truck access and installation space
ground conditions and site preparation
services, utilities and connection requirements
local council controls and intended use
bushfire, flood, wind or coastal exposure where relevant
Site suitability guidance is preliminary and does not replace advice from builders, engineers, certifiers, planners, installers or council.
Approvals, Delivery & Installation
Council requirements, permits, engineering, delivery and installation conditions can vary by property, council area, intended use and product type. Information on this website is general in nature and should not be treated as building, legal, planning, engineering or financial advice. Confirm requirements with the relevant council, certifier, builder, installer, engineer or other qualified professional before making a purchase or project decision.
Consultation
Start Your ModuHaus Consultation
Tell us about your vision and our team will help you find the most suitable modular living solution.
We’ll use your details to review your enquiry and contact you about your ModuHaus project. Your project details are not displayed publicly.
What best describes you?
Enquiries
Explore whether 12M Portable Granny Flat with 3 Bedrooms and Terrace suits your site.
Share your location, access, intended use and preferred timing. We will help you understand suitability, pricing and the next steps.
Next Collection
6M Container Home - 2 Bedroom with Terrace