6M Container Home - 2 Bedroom with Terrace exterior by ModuHaus

Collection 23

6M Container Home - 2 Bedroom with Terrace

Two-bedroom expandable home with terrace options

From$45,650AUD

Indicative starting price. Final pricing depends on site, delivery, inclusions and approvals.

Enquire Now
View Specifications

Area

~36 m2

Bedrooms

2

Outdoor

Terrace option

Bathroom

1

Compact living with an outdoor threshold.

This model combines a two-bedroom foldable format with terrace and canopy customisation options, creating a more finished lifestyle presentation.

It is suited to guest accommodation, short-stay use, rural retreats, creative studios or flexible office spaces where outdoor connection matters.

Design Philosophy

A small home that steps outside.

A terrace can change the way a compact home lives. It creates a threshold, a place to pause, and a more welcoming arrival.

Inside, the model retains the practical essentials: two bedrooms, open kitchen and bathroom within an efficient modular footprint.

6M Container Home - 2 Bedroom with Terrace lifestyle image

Lifestyle

A compact footprint with room to arrive.

The terrace option helps the home feel more settled, especially for guest stays and retreat-style projects.

Terrace options

Canopy and terrace customisation supports a more complete outdoor edge.

Two bedrooms

Suitable for guests, family overflow or compact accommodation.

Utility-ready

Ready for water and electrical connection by licensed trades.

Approx. 36 m2

Efficient internal living area in a 6M foldable format.

Key Features

Considered, down to the detail.

Terrace-ready layout

Designed for optional terrace and canopy customisation.

Two-bedroom plan

Includes kitchen and bathroom within the compact footprint.

Double-glazed windows

Supports comfort and day-to-day usability.

Heat-insulating roof

Roof system noted in the product content.

Interior

A practical interior, ready to be resolved around your use.

The layout, inclusions and finish level can be reviewed during enquiry so the model is matched to the site, intended use and required service connections.

6M Container Home - 2 Bedroom with Terrace — interior view 1
6M Container Home - 2 Bedroom with Terrace — interior view 2
6M Container Home - 2 Bedroom with Terrace — interior view 3
6M Container Home - 2 Bedroom with Terrace — interior view 4

Floor Plan

Every metre, considered.

6M Container Home - 2 Bedroom with Terrace floor plan

Indicative floor plan supplied for 6M Container Home - 2 Bedroom with Terrace.

The ModuHaus Difference

Why ModuHaus

A ModuHaus enquiry starts with the site and intended use, then works back to the right model, fit-out and approval pathway.

01

Curated product range

Each expandable model is positioned around real use cases rather than supplier catalogue language.

02

Transport-aware planning

Foldable formats help simplify freight and reduce on-site disruption.

03

Clear next steps

Access, services, fit-out options and approvals can be reviewed before purchase.

04

Guided enquiry

Our team helps you understand suitability, pricing and documentation before decisions are rushed.

Key Information

The essentials, at a glance.

Configuration

2 bedrooms

Area

Approx. 36 m2

Outdoor

Terrace/canopy options

Collection

Expandable Homes

Ideal forGuest accommodationShort-stay useRural retreatStudioOffice

Specifications

The details that shape the model.

Source-backed information for early planning. Final inclusions, dimensions and documentation should be confirmed during enquiry.

Folded Size

Approx. 2.2 m x 5.96 m

Expanded Size

Approx. 5.96 m x 5.8 m x 2.5 m

Living Area

Approx. 36 m2

Layout

2 bedrooms, kitchen, bathroom

Walls

Fire-resistant EPS panels

Windows

Double-glazed windows

Kitchen

Pre-installed kitchen cabinets

Utilities

Ready for water and electrical connection

Optional Upgrades

Configure the details that matter.

Kitchen cabinet sets with sink and appliancesInternal partition adjustmentsBuilt-in storage or wardrobe unitsExterior cladding upgradesTerrace and canopy customisationInterior finish upgrades

Planning Notes

What to confirm before the site is ready.

Delivery & Installation

Most foldable and expandable units are delivered in a compact folded format for efficient transport, then opened and installed on site. Setup timing depends on access, model selection, site conditions and required trades; typical setup is reviewed during enquiry.

Utilities

Water, electrical, plumbing and other service connections must be completed by licensed trades. HVAC, solar and off-grid systems are planned separately unless specifically quoted.

Warranty & Support

Warranty and support terms should be confirmed before purchase. Current product guidance includes support for structure, weatherproofing, internal fittings and manufacturing defects.

Council & Compliance

Approval requirements vary by council, site and intended use. Documentation can be reviewed during the enquiry process, and any final approvals, inspections or site-specific reports should be confirmed before purchase.

Standard Inclusions

Considered, and included.

Kitchen CabinetsBathroom PackageDouble-Glazed WindowsTerrace / Canopy Options

Transparent Pricing

From pricing gives a starting point, not the final project cost.

Prices shown on ModuHaus are indicative starting prices unless clearly stated otherwise. Final pricing can vary depending on product specification, site conditions, delivery location, installation scope, service connections and approval pathway.

model, size, layout and inclusions

finish level, upgrades and custom requirements

delivery distance, transport and crane requirements

site access, preparation and installation scope

service connections, engineering and certification

council or approval pathway requirements

What Happens After Enquiry

A considered review before quote or delivery discussions.

After you submit an enquiry, the ModuHaus team reviews your project details before recommending the most suitable next step. We do not treat enquiry forms as instant final quotes.

01

We receive your enquiry

Your message or Project Plan is saved for review by the ModuHaus team.

02

We review fit and context

We look at location, intended use, budget range, timing and any product recommendation.

03

We may request site details

Photos, access information, service requirements or council context may be needed before the next step.

04

You receive next-step guidance

The response may point toward a product, supplier pathway, consultation or further suitability review.

Site Suitability Matters

The right modular solution still needs the right site conditions.

A modular solution is only suitable if the site can support delivery, access, installation and the intended use. Before final pricing or delivery, key site details may need to be reviewed.

delivery access width and driveway slope

crane or truck access and installation space

ground conditions and site preparation

services, utilities and connection requirements

local council controls and intended use

bushfire, flood, wind or coastal exposure where relevant

Site suitability guidance is preliminary and does not replace advice from builders, engineers, certifiers, planners, installers or council.

Approvals, Delivery & Installation

Council requirements, permits, engineering, delivery and installation conditions can vary by property, council area, intended use and product type. Information on this website is general in nature and should not be treated as building, legal, planning, engineering or financial advice. Confirm requirements with the relevant council, certifier, builder, installer, engineer or other qualified professional before making a purchase or project decision.

Consultation

Start Your ModuHaus Consultation

Tell us about your vision and our team will help you find the most suitable modular living solution.

We’ll use your details to review your enquiry and contact you about your ModuHaus project. Your project details are not displayed publicly.

Step 1 of 617%

What best describes you?

Enquiries

Explore whether 6M Container Home - 2 Bedroom with Terrace suits your site.

Share your location, access, intended use and preferred timing. We will help you understand suitability, pricing and the next steps.

Next Collection

6M Foldable Container Home - 6M-V4

Enquire