The 6m Push-Out Pod opened on its site, folding glass doors revealing the living space and a deck

Collection 17

6m Push-Out Pod

Expandable pod — opens to 20 m²

From$21,750AUD

Indicative starting price. Final pricing depends on site, delivery, inclusions and approvals.

Enquire Now

Area (open)

~20 m²

Folded

5.9 × 2.2 m

Layout

Open-plan

Kitchenette

Optional

Bathroom

Optional

Arrives compact. Opens to twenty square metres.

The 6m Push-Out Pod travels as a slim, easily delivered module, then pushes out on site to roughly twenty square metres of open, usable space. It is the most generous pod in the collection — and among the easiest to place.

Configure it as a simple studio, or specify a kitchenette and a full bathroom for a complete, self-contained retreat. Either way, it opens in hours and is ready to live in.

Design Philosophy

Clever where it counts, calm everywhere else.

A push-out section does the hard work quietly — folding for transport, then sliding open to reveal a single, light-filled room. The engineering stays out of sight; what you experience is space, not mechanism.

Like every ModuHaus pod, it is resolved to feel like architecture, not equipment — a considered volume that settles gently onto your land.

The 6m Push-Out Pod's calm white form against a backdrop of pines

Lifestyle

Room to live, wherever it lands.

Because it ships compact and opens on site, the Push-Out Pod reaches places a fixed building can't — and adapts to whatever you need it to be.

Open in hours

The push-out section deploys in roughly six hours to a day, so you move from delivery to living almost at once.

A complete guest stay

Specify a bathroom and kitchenette and it becomes a self-contained suite for visitors or short-stay guests.

Work with room to think

Twenty square metres of open floor make a generous studio, office or creative space.

Goes where you need it

A compact transport footprint means it can reach tight or remote sites with minimal fuss.

Key Features

Considered, down to the detail.

A push-out that does the work

A sliding section expands the pod from its slim transport footprint to a generous twenty square metres on site.

Configure it your way

Choose a simple open studio, or add a kitchenette and full bathroom for complete, self-contained living.

Light along one side

Double-glazed sliding windows draw in daylight and fresh air across the open floor.

Built to travel and last

A galvanised steel frame and insulated panels stand up to transport and to Australian weather alike.

Serviced where you want it

Pre-wired and plumbing-ready for the serviced layouts — licensed trades make the final connections.

Opens in hours

On-site push-out typically takes six hours to a day, with minimal disruption to your land.

Interior

One open room, full of light.

Opened out, the Push-Out Pod is a single calm volume — sliding glazing along one side, an even, generous floor, and services resolved neatly to one end where you choose to include them.

Inside the expanded pod — a bedroom, wardrobe, bathroom and kitchenette along one open wall
Interior detail — the bathroom with shower and toilet beside a compact kitchenette
The pod from the garden, its glazed facade set against tall pines

Floor Plans

Every metre, considered.

6m Push-Out Pod floor plan 1
6m Push-Out Pod floor plan 2

Indicative layout — final dimensions confirmed in supplier plans

The ModuHaus Difference

Why ModuHaus

An ingenious expandable footprint, designed, made and delivered with the same considered care as a whole home.

01

Architect-considered design

An expandable pod resolved with the rigour of a bespoke home.

02

Partner-built pathway

Supplied through a suitable partner pathway, with final inclusions and delivery details confirmed during review.

03

Placed gently on your land

Pushed out on site in hours, with the lightest possible touch on your block.

04

Guided, end to end

One team beside you, from first idea to the day it opens.

Key Information

The essentials, at a glance.

Configuration

Open-plan · expandable

Footprint

5.9 × 2.2 m folded · ~20 m² open

Collection

Pods

Delivery

Pushes out on site in hours

Ideal forGuest accommodationAirbnb / short-stayBackyard studioHome officeCreative studioCompact living

Standard Inclusions

Considered, and included.

Push-Out Expanding SectionDouble-Glazed Sliding WindowsLED DownlightsPower PointsKitchenette (optional)Bathroom Package (optional)

Download Brochure

The full 6m Push-Out Pod, on paper.

Download the complete product brochure for detailed information, floorplans and specifications — yours to keep and share.

Download Brochure

Transparent Pricing

From pricing gives a starting point, not the final project cost.

Prices shown on ModuHaus are indicative starting prices unless clearly stated otherwise. Final pricing can vary depending on product specification, site conditions, delivery location, installation scope, service connections and approval pathway.

model, size, layout and inclusions

finish level, upgrades and custom requirements

delivery distance, transport and crane requirements

site access, preparation and installation scope

service connections, engineering and certification

council or approval pathway requirements

What Happens After Enquiry

A considered review before quote or delivery discussions.

After you submit an enquiry, the ModuHaus team reviews your project details before recommending the most suitable next step. We do not treat enquiry forms as instant final quotes.

01

We receive your enquiry

Your message or Project Plan is saved for review by the ModuHaus team.

02

We review fit and context

We look at location, intended use, budget range, timing and any product recommendation.

03

We may request site details

Photos, access information, service requirements or council context may be needed before the next step.

04

You receive next-step guidance

The response may point toward a product, supplier pathway, consultation or further suitability review.

Site Suitability Matters

The right modular solution still needs the right site conditions.

A modular solution is only suitable if the site can support delivery, access, installation and the intended use. Before final pricing or delivery, key site details may need to be reviewed.

delivery access width and driveway slope

crane or truck access and installation space

ground conditions and site preparation

services, utilities and connection requirements

local council controls and intended use

bushfire, flood, wind or coastal exposure where relevant

Site suitability guidance is preliminary and does not replace advice from builders, engineers, certifiers, planners, installers or council.

Approvals, Delivery & Installation

Council requirements, permits, engineering, delivery and installation conditions can vary by property, council area, intended use and product type. Information on this website is general in nature and should not be treated as building, legal, planning, engineering or financial advice. Confirm requirements with the relevant council, certifier, builder, installer, engineer or other qualified professional before making a purchase or project decision.

Consultation

Start Your ModuHaus Consultation

Tell us about your vision and our team will help you find the most suitable modular living solution.

We’ll use your details to review your enquiry and contact you about your ModuHaus project. Your project details are not displayed publicly.

Step 1 of 617%

What best describes you?

Enquiries

Imagine the Push-Out Pod opening on your land.

Tell us how you'd use a generous, expandable space — and which layout suits you. We'll explore whether the 6m Push-Out Pod is the right beginning.

Next Collection

Single Toilet Block

Enquire