6M Container Home - 13FT with Bathroom exterior by ModuHaus

Collection 19

6M Container Home - 13FT with Bathroom

Compact foldable home with bathroom

From$22,487AUD

Indicative starting price. Final pricing depends on site, delivery, inclusions and approvals.

Enquire Now
View Specifications

Area

~24 m2

Expanded

5.96 x 4.00 m

Bathroom

1

A compact unit with essential bathroom functionality.

This 6M foldable model adds bathroom planning to a compact transport format, making it more functional than an empty shell while retaining layout flexibility.

It is suited to guest suites, studios, site offices, short-stay accommodation and temporary living where the final use and approvals can be reviewed early.

Design Philosophy

Essential services, flexible interior.

The integrated bathroom gives the unit a more complete foundation, while the remaining space can be planned around its intended use.

It sits between a raw structure and a fully configured small home.

6M Container Home - 13FT with Bathroom lifestyle image

Lifestyle

More self-contained, still compact.

A useful option where bathroom access makes the difference between a room and a more complete space.

Bathroom planned in

Includes wet/dry separated bathroom, cabinet, toilet and showerhead.

Approx. 24 m2

A compact internal area for guest, office or studio use.

Flexible remaining space

Plan furniture, storage or work zones around the intended use.

Foldable delivery

Designed to transport compactly and expand on site.

Key Features

Considered, down to the detail.

Integrated bathroom

A more functional base for accommodation or site use.

Double-glazed windows

Insulated tempered glass supports comfort and usability.

Galvanised steel frame

Durable foldable construction.

Customisable fit-out

Kitchen, storage and partition options can be reviewed.

Interior

A practical interior, ready to be resolved around your use.

The layout, inclusions and finish level can be reviewed during enquiry so the model is matched to the site, intended use and required service connections.

6M Container Home - 13FT with Bathroom — interior view 1
6M Container Home - 13FT with Bathroom — interior view 2
6M Container Home - 13FT with Bathroom — interior view 3

The ModuHaus Difference

Why ModuHaus

A ModuHaus enquiry starts with the site and intended use, then works back to the right model, fit-out and approval pathway.

01

Curated product range

Each expandable model is positioned around real use cases rather than supplier catalogue language.

02

Transport-aware planning

Foldable formats help simplify freight and reduce on-site disruption.

03

Clear next steps

Access, services, fit-out options and approvals can be reviewed before purchase.

04

Guided enquiry

Our team helps you understand suitability, pricing and documentation before decisions are rushed.

Key Information

The essentials, at a glance.

Configuration

Bathroom model

Area

Approx. 24 m2

Footprint

5.96 m x 4.00 m expanded

Collection

Expandable Homes

Ideal forGuest suiteStudioSite officeShort-stay unit

Specifications

The details that shape the model.

Source-backed information for early planning. Final inclusions, dimensions and documentation should be confirmed during enquiry.

Folded Size

4.00 m x 2.2 m x 2.5 m

Expanded Size

5.96 m x 4.00 m x 2.5 m

Living Area

Approx. 24 m2

Approx. Weight

2,560 kg

Frame

Galvanised steel structure

Walls

Fire-resistant EPS insulated panels

Windows

Double-glazed insulated tempered glass

Bathroom

Wet/dry separated bathroom, cabinet, toilet and showerhead

Optional Upgrades

Configure the details that matter.

Kitchen cabinet sets with sink and appliancesPartition wallsBuilt-in storage or wardrobe unitsOptional cladding and finish upgrades

Planning Notes

What to confirm before the site is ready.

Delivery & Installation

Most foldable and expandable units are delivered in a compact folded format for efficient transport, then opened and installed on site. Setup timing depends on access, model selection, site conditions and required trades; typical setup is reviewed during enquiry.

Utilities

Water, electrical, plumbing and other service connections must be completed by licensed trades. HVAC, solar and off-grid systems are planned separately unless specifically quoted.

Warranty & Support

Warranty and support terms should be confirmed before purchase. Current product guidance includes support for structure, weatherproofing, internal fittings and manufacturing defects.

Council & Compliance

Approval requirements vary by council, site and intended use. Documentation can be reviewed during the enquiry process, and any final approvals, inspections or site-specific reports should be confirmed before purchase.

Standard Inclusions

Considered, and included.

Bathroom PackageGalvanised Steel FrameInsulated PanelsDouble-Glazed Windows

Transparent Pricing

From pricing gives a starting point, not the final project cost.

Prices shown on ModuHaus are indicative starting prices unless clearly stated otherwise. Final pricing can vary depending on product specification, site conditions, delivery location, installation scope, service connections and approval pathway.

model, size, layout and inclusions

finish level, upgrades and custom requirements

delivery distance, transport and crane requirements

site access, preparation and installation scope

service connections, engineering and certification

council or approval pathway requirements

What Happens After Enquiry

A considered review before quote or delivery discussions.

After you submit an enquiry, the ModuHaus team reviews your project details before recommending the most suitable next step. We do not treat enquiry forms as instant final quotes.

01

We receive your enquiry

Your message or Project Plan is saved for review by the ModuHaus team.

02

We review fit and context

We look at location, intended use, budget range, timing and any product recommendation.

03

We may request site details

Photos, access information, service requirements or council context may be needed before the next step.

04

You receive next-step guidance

The response may point toward a product, supplier pathway, consultation or further suitability review.

Site Suitability Matters

The right modular solution still needs the right site conditions.

A modular solution is only suitable if the site can support delivery, access, installation and the intended use. Before final pricing or delivery, key site details may need to be reviewed.

delivery access width and driveway slope

crane or truck access and installation space

ground conditions and site preparation

services, utilities and connection requirements

local council controls and intended use

bushfire, flood, wind or coastal exposure where relevant

Site suitability guidance is preliminary and does not replace advice from builders, engineers, certifiers, planners, installers or council.

Approvals, Delivery & Installation

Council requirements, permits, engineering, delivery and installation conditions can vary by property, council area, intended use and product type. Information on this website is general in nature and should not be treated as building, legal, planning, engineering or financial advice. Confirm requirements with the relevant council, certifier, builder, installer, engineer or other qualified professional before making a purchase or project decision.

Consultation

Start Your ModuHaus Consultation

Tell us about your vision and our team will help you find the most suitable modular living solution.

We’ll use your details to review your enquiry and contact you about your ModuHaus project. Your project details are not displayed publicly.

Step 1 of 617%

What best describes you?

Enquiries

Explore whether 6M Container Home - 13FT with Bathroom suits your site.

Share your location, access, intended use and preferred timing. We will help you understand suitability, pricing and the next steps.

Next Collection

6M Container Home with 2 Bedrooms - Glass Curtain Wall

Enquire